24/033 - Qualification System for the provision of Engineering, Procurement and Construction Services for South West Scotland Onshore System (SWSOS)  | Tenderlake

24/033 - Qualification System for the provision of Engineering, Procurement and Construction Services for South West Scotland Onshore System (SWSOS) 

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
20 November 2025
Closing Date:
12 November 2035
Location(s):
IE IRELAND
Description:
Experienced contractors are sought to provide engineering, procurement, and construction services for critical infrastructure upgrades in the South West Scotland Onshore System Decarbonisation Programme, focusing on the design and integration of electric drive compressor halls while ensuring compliance with safety and cybersecurity standards.

GNI and GNI (UK) are seeking experienced EPCS contractors to deliver a series of critical infrastructure upgrades as part of the SWSOS Decarbonisation Programme, a cornerstone of our commitment to achieving Net Zero by 2050. This tender covers multiple work packages, including the design, procurement, construction, and integration of new electric drive compressor halls across operational sites in Scotland. The successful contractor will manage complex interfaces between new and existing assets, ensuring seamless integration of mechanical, electrical, and control systems, while adhering to stringent cybersecurity and safety standards. This initiative represents a strategic investment in sustainable energy infrastructure and offers an opportunity to collaborate on projects of significant scale and impact within a multinational framework.  SCOPE OF REQUIREMENTS:  The scope of this tender encompasses overall project management and delivery across multiple work packages, including but not limited to the following:  Detailed Design Procurement  Procurement of detailed design for new compressor halls, based on the GNI suite of functional specifications.    Materials Procurement  Mechanical materials: high-pressure pipework, valves, and fittings.  Electrical materials: interconnecting cabling and junction boxes.  Instrumentation materials: transmitters and data cabling.    Note: The second-stage tender process (CFC) will confirm the final requirements and clarify the full scope boundaries for the electric motor drive (EMD) package and the contractor’s scope.   Construction Activities  Construction of new compressor halls.  Completion of all civil works, including excavations, foundations, structural steel, compressor foundations, and ancillary electrical buildings.  Installation of interconnecting pipework, electrical and control cabling, and junction boxes.    Integration and System Tie-ins  Integration of new electric drive compressors into the existing fleet of gas turbines.  Mechanical, electrical, and control system tie-ins at operational compressor stations across GNI UK sites in Scotland.    Security and Cybersecurity  Installation of security systems and implementation of cybersecurity controls in line with GNI specifications.    Testing and Commissioning  Full responsibility for FAT and SAT activities.  Commissioning and start-up of all new systems.  Additional Scope Notes:  GNI may procure electric motor drive (EMD) packages separately.  GNI will manage all permitting and planning permissions.  GNI will separately upgrade incoming site electrical supply to power the new EMD packages.    Indicative EPCS Scope Boundary: The EPCS scope is envisaged to cover all elements required for the delivery of an electric drive compressor station as outlined above.  A more detailed scope is provided within the Appendices of the Qualification System Questionnaire documents


LOT-0001
24/033 - Qualification System for the provision of Engineering, Procurement and Construction Services for South West Scotland Onshore System (SWSOS) .
GNI and GNI (UK) are seeking experienced EPCS contractors to deliver a series of critical infrastructure upgrades as part of the SWSOS Decarbonisation Programme, a cornerstone of our commitment to achieving Net Zero by 2050. This tender covers multiple work packages, including the design, procurement, construction, and integration of new electric drive compressor halls across operational sites in Scotland. The successful contractor will manage complex interfaces between new and existing assets, ensuring seamless integration of mechanical, electrical, and control systems, while adhering to stringent cybersecurity and safety standards. This initiative represents a strategic investment in sustainable energy infrastructure and offers an opportunity to collaborate on projects of significant scale and impact within a multinational framework.  SCOPE OF REQUIREMENTS:  The scope of this tender encompasses overall project management and delivery across multiple work packages, including but not limited to the following:  Detailed Design Procurement  Procurement of detailed design for new compressor halls, based on the GNI suite of functional specifications.    Materials Procurement  Mechanical materials: high-pressure pipework, valves, and fittings.  Electrical materials: interconnecting cabling and junction boxes.  Instrumentation materials: transmitters and data cabling.    Note: The second-stage tender process (CFC) will confirm the final requirements and clarify the full scope boundaries for the electric motor drive (EMD) package and the contractor’s scope.   Construction Activities  Construction of new compressor halls.  Completion of all civil works, including excavations, foundations, structural steel, compressor foundations, and ancillary electrical buildings.  Installation of interconnecting pipework, electrical and control cabling, and junction boxes.    Integration and System Tie-ins  Integration of new electric drive compressors into the existing fleet of gas turbines.  Mechanical, electrical, and control system tie-ins at operational compressor stations across GNI UK sites in Scotland.    Security and Cybersecurity  Installation of security systems and implementation of cybersecurity controls in line with GNI specifications.    Testing and Commissioning  Full responsibility for FAT and SAT activities.  Commissioning and start-up of all new systems.  Additional Scope Notes:  GNI may procure electric motor drive (EMD) packages separately.  GNI will manage all permitting and planning permissions.  GNI will separately upgrade incoming site electrical supply to power the new EMD packages.    Indicative EPCS Scope Boundary: The EPCS scope is envisaged to cover all elements required for the delivery of an electric drive compressor station as outlined above.  A more detailed scope is provided within the Appendices of the Qualification System Questionnaire documents

The Buyer:
Gas Networks Ireland
Additional information:
Link:
Additional document: 0000
Link:
Download Full Notice as PDF
Link:
View Full Notice
CPV Code(s):
45231220 - Construction work for gas pipelines