Modernization of the Water Supply Network on Tuwima Street, Kniaźnina Street, Czecha Street, Lokajskiego Street, and Kusocińskiego Street in Puławy
Contract Value:
-
Notice Type:
Contract Notice
Published Date:
05 November 2026
Closing Date:
10 November 2026
Location(s):
PL81 Lubelskie (PL Poland/POLSKA)
Description:
The project involves the modernization of the water supply network on several streets in Puławy, utilizing static cracking methods and PE pipes, with a newly extended bid submission deadline.
CHANGE TO NOTICE No. 2026-63878-295723 (version published 2026-11-05). Bid submission deadline: 2026-11-06 10:00 -> 2026-11-10 10:00. The current content of the notice is below; see link for the original notice.
"Modernization of the water supply network on Tuwima Street and Kniaźnina Street ATTENTION!!! Change of bid submission deadline!!! 2. New bid submission deadline: Bids must be submitted by 10.11.2026 by 10:00 am.
The subject of the contract is the modernization of the existing water supply network on Tuwima Street and Kniaźnina Street in Puławy using static cracking without changing the network location. The new water supply network should be constructed using PE pipes. The construction works will be carried out within task no. 1 entitled: "Replacement of distribution water supply networks made of asbestos cement and pipelines with an operating period exceeding 50 years" covered by the project entitled: "Improvement of water supply safety and quality in Puławy", implemented under the European Funds for Infrastructure, Climate, Environment 2021–2027 program (FEnIKS). Works will be carried out based on: - notification dated 08.01.2024 concerning the reconstruction of the water supply network on plot no. 544/4 at Lokajskiego Street, plot no. 544/6 at Czecha Street, plots no. 3241/1 and 543/1 at Kusocińskiego Street, and plots no. 546 and 559/3 at Bema Street in Puławy, case ref. AB.6743.9.6.2023.MS, - notification dated 13.12.2023 concerning reconstruction of the water supply network on plots no. 865/2, 981, 1112, 1144 located at Tuwima Street and Kniaźnina Street in Puławy, to which the Puławy District Governor (Starosta) raised no objection. Within the contract scope related to the reconstruction of the water supply network on Tuwima and Kniaźnina Streets, the following must be done: - perform cracking of the existing DN100 water supply network, probably made of asbestos cement pipes, on Tuwima Street and Kniaźnina Street in Puławy, with a total length of approx. 344.35 m, from the intersection of Chmielowskiego and Tuwima Streets to the intersection of Kniaźnina and Sienkiewicza Streets – detailed water supply network location for reconstruction is defined in the project documentation. For the network modernization, water pipes made of PE 100 RC SDR11, two-layer with a protective PP jacket with a diameter of DN160 mm should be used, - the sections of connections for reconstruction indicated in the project documentation within the road lane along the existing route are subject only to reconnection to the new pipeline; replacement of connections from the network to property boundaries should not be assumed, only reconnections to the new pipeline. In case an "insert" pipe needs to be made on the connections to enable their connection to the modernized network, a PE100 RC SDR11 pipe with an internal diameter not smaller than the internal diameter of the existing connection pipe should be used. In case of discrepancies between the parameters of existing connections assumed in the project documentation regarding their diameter and their actual dimensions (diameter) that require the use of different assembly materials for connecting the connection to the new network than those provided in the project documentation, the Contractor will agree with the Ordering Party on an alternative method of connection and parameters of assembly materials. - installation of fittings, including hydrants, valves, joints, fittings, etc. Within the scope of the contract concerning the reconstruction of the water supply network on Czecha, Lokajskiego, Bema, and Kusocińskiego Streets, the following must be done: - perform cracking of existing sections of water supply networks DN100, probably made of asbestos cement pipes, on Czecha, Lokajskiego, Bema, and Kusocińskiego Streets in Puławy, with a total length of approx. 481.85 m, from the intersection of Kusocińskiego and Czecha Streets to the end of Lokajskiego Street and from Bema Street to the boundary between plots no. 543/3 and 543/1 (network on plots no. 544/3, 542/1, and 543/3 is not subject to reconstruction due to lack of consent to carry out construction works on these plots) – detailed water supply network location for reconstruction is defined in the project documentation. For network modernization, water pipes made of PE 100 RC SDR11, two-layer with a protective PP jacket with a diameter of DN160 mm should be used, - the sections of connections for reconstruction indicated in the project documentation within the road lane along the existing route are subject only to reconnection to the new pipeline; replacement of connections from the network to property boundaries should not be assumed, only reconnections to the new pipeline. In the event that an "insert" pipe is required to connect to the modernized network, a PE100 RC SDR11 pipe with an internal diameter not smaller than the internal diameter of the existing connection pipe should be used. The order's scope includes the reconstruction of one connection along a new route – concerning the connection between nodes W34-W34a with a length of approx. 3.5 m. In case of discrepancies between the parameters of existing connections assumed in the project documentation concerning their diameter and their actual dimensions (diameter) that require the use of different assembly materials for connecting the connection to the new network than those provided in the project documentation, the Contractor will agree with the Ordering Party on an alternative method of connection and parameters of assembly materials. - decommissioning of a pipeline section approx. 42 m and construction of a new water supply connection section (between nodes W34-W34a approx. 3.5 m in length). - installation of fittings, including hydrants, valves, joints, fittings, etc. The Ordering Party does not have knowledge about the presence of asbestos cement along the entire network route planned for modernization; it is possible that other materials and different dimensions of the existing network than assumed are present, so the Contractor should provide tools that allow modernization of water supplies from different materials and with different diameters. The presence of different materials and diameters of the existing water supply (networks, connections) planned for modernization than those assumed in the project documentation shall not constitute grounds for the Contractor to claim an increase of the basic contractual remuneration – the offer price. The area where construction works are planned is the road lanes of municipal roads managed by the Municipal Roads Authority in Puławy. The Ordering Party is not the landowner where the works will be carried out but has the right to use the property for construction purposes. However, the responsibility for obtaining decisions/permits allowing works on individual properties for access to the site rests with the Contractor. The Contractor is also obliged to implement the provisions of decisions/permits regarding land occupation for the works, e.g., preparing a traffic management plan during the works and establishing and maintaining temporary traffic organization. The Contractor is obliged to create and maintain at its own expense bypasses for existing connections. Bypasses should ensure continuous water supply during works with the required quantity and at a minimum pressure of 0.2 MPa for all consumers supplied from the modernized network. The bypass should be made with one-sided feed. Before connecting the bypass to the network, the Contractor will present to the Ordering Party positive test results for the bypass containing at least free chlorine content and indicators of: Escherichia coli, coliform bacteria, and enterococci. The Contractor will prepare, in agreement with the Ordering Party, a place for installing the water meter at the point where the bypass will be supplied from the water network. The water costs consumed by consumers connected to the bypass will not charge the Contractor and will be settled based on the readings of water meters installed at the properties. Costs of water for flushing, disinfection of the bypass and new water supply network, and other technological needs, as well as leaks (water losses), will be charged to the Contractor. The water costs charged to the Contractor will be determined based on the difference between the water meter reading at the bypass supply and the total water consumed by consumers supplied from the bypass calculated from readings of water meters installed at the properties. If an "insert" pipe is required on the connection to connect it to the modernized network, a PE100 RC SDR11 pipe with an internal diameter not smaller than the internal diameter of the existing connection pipe shall be used. In case of discrepancies between the parameters of existing connections assumed in the project documentation regarding their diameter and their actual dimensions (diameter) that require the use of different assembly materials for connecting the connection to the new network than those provided in the project documentation, the Contractor shall agree with the Ordering Party on an alternative method of connection and parameters (including diameter) of assembly materials. Removed fittings should be stored at a location designated by the Ordering Party – at the water station at Skowieszyńska Street 51. If it is not technically possible to carry out works according to the project documentation, a change of technology for carrying out the works is allowed after obtaining the Ordering Party's consent. Any reconnection of unregistered connections discovered during the works execution that are not included in the project documentation will be treated as additional works and commissioned based on contractual provisions regulating additional works execution. If the Contractor or Ordering Party finds that the pipes indicated in the project documentation for reconnection are missing in the field, such works will first be treated as substitute works for reconnection of unregistered connections not included in the project documentation, and if it is impossible to classify them as substitute works, they will then be qualified as abandoned works. Detailed description of the subject of the order in ToR III. Description of the subject of the contract. Category: Construction works / Construction works CPV: 45232000-2 Auxiliary works concerning pipelines and cables, 45262600-7 Various special construction works, 45332000-3 Water and sewerage installation works, 45453000-7 Repair and renovation works Place of implementation: Puławy, Puławy county, Lublin voivodeship Warranty period: The Contractor grants the Ordering Party a 5-year warranty on the entire subject of the contract. Award criteria: - Price only. Price + 100% = 100 points Details in Chapter XVI. DESCRIPTION OF EVALUATION CRITERIA WITH WEIGHTS AND METHOD OF OFFER EVALUATION
Participation conditions: - Knowledge and experience: The Ordering Party will consider the condition fulfilled if the Contractor demonstrates that in the last 10 years before the bid submission deadline, or if operating for a shorter period – during that period, the Contractor has completed at least one construction work whose subject was: - execution of reconstruction/modernization of a water supply network of at least 200 m length with a diameter of at least DN100, by cracking method using PE pipes of at least DN125 (external diameter), - construction and maintenance of a bypass during works at the modernized water supply. - Personnel able to perform the contract: A construction manager with required professional qualifications to perform independent technical functions in construction – to manage construction works without restrictions in the installation specialty regarding networks, installations, and equipment for heating, ventilation, gas, water supply, and sewerage or qualifications issued under previously applicable law to perform independent technical functions in construction – to manage construction works without restrictions in the installation specialty regarding networks, installations, and water supply equipment.
The Buyer:
Miejskie Przedsiębiorstwo Wodociągów i Kanalizacji ,,Wodociągi Puławskie” Spółka z o.o. w Puławach