Reconstruction of Water and Sewage Infrastructure Damaged by Flooding in the Kłodzko Municipality Area. | Tenderlake

Reconstruction of Water and Sewage Infrastructure Damaged by Flooding in the Kłodzko Municipality Area.

Contract Value:
PLN 31M - 31M
Notice Type:
Contract Notice
Published Date:
04 November 2026
Closing Date:
30 November 2026
Location(s):
PL517 Wałbrzyski (PL Poland/POLSKA)
Description:
Comprehensive construction works are required for the reconstruction of water and sewage infrastructure in the Kłodzko Municipality, including modernization of a wastewater treatment plant, water treatment stations, and sewage pumping stations, with an emphasis on environmental compliance and specific contractor qualifications.

1. The subject of the contract is the comprehensive execution of construction works within the task/project titled "Reconstruction of water and sewage infrastructure damaged by flooding in the Kłodzko Municipality area." The contract is divided into 3 parts: Part 1 – "Reconstruction and modernization of the Wastewater Treatment Plant in Ołdrzychowice Kłodzkie." Part 2 – "Reconstruction and modernization of the Water Treatment Stations (WTS) along with water intakes": WTS Krosnowice II 204, WTS Krosnowice I ul. Wodna, WTS Jaszkowa. Part 3 – "Reconstruction of sewage pumping stations destroyed by flooding in the Kłodzko Municipality area together with the reconstruction of emergency sections of the water supply network in Krosnowice." A detailed description of the subject of the contract, technical requirements, scope of work, project documentation, and specified requirements are set forth in the Terms of Reference (TOR) along with attachments.
2. The contracting authority, pursuant to Article 139 of the Public Procurement Law (PPL), will first examine and evaluate the bids, then will carry out the subjective qualification of the contractor whose offer was the highest rated regarding the absence of grounds for exclusion and fulfillment of participation conditions (reverse procedure). According to Article 139(2) PPL, the contracting authority anticipates that the Statement on the Absence of Grounds for Exclusion (JEDZ) will not be submitted together with the offer but upon request from the contractor whose offer was highest rated.
3. The contracting authority requires compliance with the DNSH principle (Do No Significant Harm), understood as carrying out the contract in a way that limits negative environmental impact. Specifically (where applicable):
a) limit the amount of waste and packaging and handle them in accordance with regulations,
b) ensure compliance of offered products with applicable environmental regulations (including energy efficiency/labeling where applicable),
c) ensure compliant handling of waste generated in connection with delivery/installation/commissioning (if any),
d) upon the contracting authority’s request, provide explanations or documents confirming the fulfillment of the above requirements – appropriate to the scope of the contract.
4. The task is co-financed by the European Funds for Infrastructure, Climate, Environment 2021–2027 program (FENX/FEnIKS), under measure FENX.09.01.
5. The contracting authority reserves the obligation of personal execution by the contractor of key contract elements:
a) Part 1: reconstruction of the biological reactor [no. 7] and secondary settler [no. 8],
b) Part 2: replacement of the water treatment technological system in WTS,
c) Part 3: replacement of operational and structural devices in sewage pumping stations (SPS).
6. The offer, JEDZ, and other required documents must be prepared electronically and signed with a qualified electronic signature.
7. The contractor may submit one offer for one, several, or all parts of the contract. Along with the offer, the contractor submits documents required by law and the Terms of Reference (ToR), particularly powers of attorney, commitments of resource providers, statements of contractors jointly bidding under Article 117(4) PPL, statements regarding the absence of grounds for exclusion under Article 7(1) of the Sanctions Act and Article 5k of Council Regulation (EU) No 833/2014.
8. The contracting authority will exclude a contractor from proceedings in cases specified in Article 108(1) of the PPL (mandatory exclusion reasons). No optional exclusion grounds under Article 109(1) PPL are anticipated. The contracting authority will exclude a contractor in cases specified in Article 5k of Council Regulation (EU) No 833/2014 and Article 7(1) of the Act of April 13, 2022, on special solutions to counter supporting aggression against Ukraine and for national security protection.
9. Regarding absence of grounds for exclusion, the contracting authority will require: extracts from the National Criminal Register under Article 108(1)(1) and (2) and Article 108(1)(4) PPL, statements under Article 108(1)(5) PPL, and the contractor’s own statement on the currency of JEDZ information concerning exclusion grounds.
10. Regarding fulfilment of participation conditions, the contracting authority will require the following subjective evidence from the contractor: bank or credit union information confirming available financial resources or creditworthiness, dated within no earlier than 3 months before submission; documents confirming civil liability insurance related to the subject of contract with a minimum coverage sum; a list of construction works properly performed in the last 5 years (or shorter if applicable), indicating type, value, date, place, and beneficiaries of these works along with evidence of their proper execution; a list of persons assigned by the contractor to perform the contract, especially those responsible for construction management, technology, control and measurement automation (AKPiA), and PLC/SCADA programming, including their qualifications, licenses, experience, scope of duties, and basis of availability; and financial statements confirming the economic and financial situation.
11. The contracting authority requires a bid bond of:
for Part 1: PLN 425,000; for Part 2: PLN 80,000; for Part 3: PLN 85,000;
12. The contracting authority requires a mandatory site inspection.
13. Contract execution deadlines:
Part 1: until 30.06.2029;
Part 2: until 30.10.2027;
Part 3: until 30.10.2027.
14. The contracting authority requires a performance bond amounting to 5% of the gross offer price.
15. The minimum required warranty period for the executed subject of the contract is 60 months.


LOT-0001
Part 1
"Reconstruction and modernization of the Wastewater Treatment Plant in Ołdrzychowice Kłodzkie."
Detailed description of the contract subject, technical requirements, scope of work, project documentation, and implementation requirements are set out in the Terms of Reference (TOR) with attachments, constituting Annex 1 to the Terms and Conditions of Contract (SWZ).


LOT-0002
Part 2
"Reconstruction and modernization of the Water Treatment Stations (WTS) along with water intakes": WTS Krosnowice II 204, WTS Krosnowice I ul. Wodna, WTS Jaszkowa.
Detailed description of the contract subject, technical requirements, scope of work, project documentation, and implementation requirements are set out in the Terms of Reference (TOR) with attachments, constituting Annex 1 to the Terms and Conditions of Contract (SWZ).


LOT-0003
Part 3
"Reconstruction of sewage pumping stations destroyed by flooding in the Kłodzko Municipality area together with the reconstruction of emergency sections of the water supply network in Krosnowice."
Detailed description of the contract subject, technical requirements, scope of work, project documentation, and implementation requirements are set out in the Terms of Reference (TOR) with attachments, constituting Annex 1 to the Terms and Conditions of Contract (SWZ).
Conditions for participation in the procedure:
Economic or financial situation
The contractor meets the condition if they demonstrate that:
they have financial resources or creditworthiness of at least:
Part 3 – 5,000,000.00 PLN
they are insured for civil liability related to the activity connected to the subject of contract with a coverage sum not less than:
Part 3 – 2,000,000.00 PLN
they meet the current liquidity ratio in each of the last 3 financial years (2023 - 2024 - 2025): current liquidity (current assets / short-term liabilities) > 1.3.
Technical or professional capacity – experience
Due to lack of applicable executive regulations at the initiation of the procedure specifying contractor capacity levels for construction works relevant to this contract, the contracting authority independently defines the technical or professional capacity conditions under Article 112(3) PPL.
The contractor meets the condition if they demonstrate that in the last 5 years before the bid submission deadline, or if the business period is shorter – during that period, they have properly performed at least:
for Part 3 – one construction work including the construction, expansion, or modernization of sewage pumping stations and related water or sewage network works, with the contract value not less than 2,000,000.00 PLN gross.
Management Staff
The condition regarding persons assigned by the contractor to perform the contract will be considered met if the contractor shows that for the contract duration, among those performing the contract, they have or will have:
1) at least one person who will participate in the execution of the contract as Construction or Works Manager, holding unlimited construction licenses in structural/construction or installation specialties covering networks, installations, thermal, ventilation, gas, water, and sewage devices for management of construction works issued under current law (or equivalent under earlier legislation sufficient for contract execution).
Professional experience (CM): at least 10 years of professional experience (counted from obtaining construction qualifications) as construction or works manager including:
in Part 3: performed at least 10 sewage pumping stations (SPS) or 1 km of water supply network sections, finalized and properly executed construction works involving construction, rebuilding/expansion, or modernization worth at least 2,000,000 PLN gross in total.
2) at least one person who will participate in the execution as Water and Wastewater Technologist,
Professional experience: at least 5 years in the position of technologist implementing technology, commissioning, and start-up:
in Part 3: performed technological start-up of sewage pumping stations at at least 10 SPS with 2 or 3 pumps each with min. capacity of 5 dm3/s, total contract value at least 2,000,000 PLN gross.
Additionally, the contractor will demonstrate that they have or will have:
3) a specialist in control-measurement and automation instrumentation (AKPiA) – holding qualifications:
- D (group D1) – authorizing supervision of operation of devices, installations, and networks under supervision,
- E (group E1) – authorizing operation of devices, installations, and networks at the operating position.
This person must have at least 3 years of experience in automation and control instrumentation works including at least one completed project involving construction, expansion, or modernization of wastewater treatment plants with sewage pumping stations and/or water treatment stations.
4) a PLC and SCADA programmer – with experience programming PLC control systems and implementing SCADA systems for wastewater treatment plants and/or water treatment stations.
This person must have experience participating in at least one completed project involving construction, expansion, or modernization of a system controlling at least 3 PLC controllers or PLC and 3 distributed input/output devices, including building a SCADA system.

The Buyer:
"Wodociagi Gminy Kłodzko" sp. z o.o.
Additional information:
Link:
Additional document: generated_id
Link:
View Full Notice
Link:
Download Full Notice as PDF
CPV Code(s):
45000000 - Construction work
45231300 - Construction work for water and sewage pipelines
45233140 - Roadworks
45252120 - Water-treatment plant construction work
45252127 - Wastewater treatment plant construction work
45252200 - Purification plant equipment
45310000 - Electrical installation work
45316100 - Installation of outdoor illumination equipment
71320000 - Engineering design services