The primary and secondary technology of the Leibstadt substation is reaching the end of its technical lifespan. Therefore, Swissgrid is replacing the primary and secondary technology and building its own substation building. This tender is for the necessary planning services for Swissgrid Phases 32, 33, and 41 (based on the SIA phases). Phases 51, 52, and 53 are also part of the tender but are considered optional services.
The primary and secondary technologies of the Leibstadt substation are reaching the end of their technical lifespan. Therefore, Swissgrid is replacing the primary and secondary technologies and constructing its own substation building. As part of this call for tenders, the necessary planning services for Swissgrid phases 32, 33, and 41 (based on the SIA phases) are sought. The other phases 51, 52, and 53 are also part of the call for tenders, but as optional services.
LOT-0000
UW Leibstadt - General Planner Phases 32 - 53.
The primary and secondary technology of the Leibstadt substation is reaching the end of its technical lifespan. Therefore, Swissgrid is replacing the primary and secondary technology and constructing its own substation building. This tender is for the necessary planning services for Swissgrid Phases 32, 33, and 41 (based on the SIA phases). Phases 51, 52, and 53 are also part of the tender but are considered optional services.