The subject of the order is the purchase and installation of an intelligent photovoltaic system along with a hybrid control system and energy storage in the building of the Data Processing Center of the Science and Technology Park in Opole, at ul. Technologiczna 2.
A. The installation for connection CPD1 will consist of an energy management system with a hybrid control system, an electricity storage unit with a capacity of 744 kWh and a power of 184 kW, and a renewable energy source in the form of a photovoltaic system with a total power of 299.68 kW, placed on the ground and in carports along with a charging station.
B. The installation for connection CPD2 will consist of an energy management system with a hybrid control system, an electricity storage unit with a capacity of 744 kWh and a power of 184 kW, and a renewable energy source in the form of a photovoltaic system with a total power of 149.86 kW, also placed on the ground.
The ordering party has issued connection conditions and signed a connection agreement for the installation with Tauron Dystrybucja S.A.
The ordering party received an investment loan from the National Reconstruction and Resilience Plan as part of Investment B.3.4.1 "Investments for the Green Transformation of Cities."
A detailed description of the subject of the order is included in the description of the subject of the order, which constitutes attachment no. 1A to the SWZ.
LOT-0001
Intelligent Hybrid Renewable Energy Source for CPD1 and CPD2 Connections at the Data Processing Center of the Science and Technology Park in Opole.
The subject of the order is the purchase and installation of an intelligent photovoltaic system along with a hybrid control system and energy storage in the building of the Data Processing Center of the Science and Technology Park in Opole, at ul. Technologiczna 2.
A. The installation for connection CPD1 will consist of an energy management system with a hybrid control system, an electricity storage unit with a capacity of 744 kWh and a power of 184 kW, and a renewable energy source in the form of a photovoltaic system with a total power of 299.68 kW, placed on the ground and in carports along with a charging station.
B. The installation for connection CPD2 will consist of an energy management system with a hybrid control system, an electricity storage unit with a capacity of 744 kWh and a power of 184 kW, and a renewable energy source in the form of a photovoltaic system with a total power of 149.86 kW, also placed on the ground.
The ordering party has issued connection conditions and signed a connection agreement for the installation with Tauron Dystrybucja S.A.
The ordering party received an investment loan from the National Reconstruction and Resilience Plan as part of Investment B.3.4.1 "Investments for the Green Transformation of Cities."
3.1. A detailed description of the subject of the order is included in the description of the subject of the order, which constitutes attachment no. 1A to the SWZ.