Perquie Lot 3: BOP with AC & DC/AC O&M (engineering, equipment procurement, construction, commissioning and O&M) | Tenderlake

Perquie Lot 3: BOP with AC & DC/AC O&M (engineering, equipment procurement, construction, commissioning and O&M)

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
08 July 2026
Closing Date:
30 July 2026
Location(s):
FRI13 Landes (FR FRANCE)
Assessment:
This notice contains 1 positive AI Assessment(s) of your products/services' relevance for this procurements.  
Sign in to Tenderlake with your Pro or Primary account to read the assessments.
Description:
The project involves engineering, procurement, construction, and operation and maintenance of a Battery Energy Storage System with a capacity of 130MWh to 270MWh and a power output of 65MW, requiring detailed execution plans and ongoing site management for an estimated duration of 20 years.

The bidder's scope for the Perquie Battery Energy Storage System (BESS) project includes engineering, procurement of all equipment (excluding DC block), construction, and operation and maintenance (O&M).
Battery usable capacity approximately 130MWh to 270MWh at the beginning of life / Battery power approximately 65MW at POC 63 KV / Technology: LFP (lithium iron phosphate)
Estimated COD: August 2028
The bidder must respond to the engineering scope, producing detailed execution plans for all components of the Power Plant. They must address the work scope, which will include complete or partial site preparation, supply, and installation of AC block equipment (PCS, skid, control command), installation of DC equipment provided by the project owner integrating them into their calculations, ensuring supply chain management, their installation on site, and their connection.
The bidder must respond to the O&M scope. The operation and maintenance of the site will be based on an estimated duration of 20 years, during which the client may decide to terminate the contract for convenience without cost. The provider must account for all technical characteristics of the project related to the execution phase. During this contract period, the provider will receive an annual lump-sum remuneration based on their tariff offer which will include:
Operation, 24/7 supervision with remote alarm acknowledgment and site security; Preventive maintenance of AC, DC equipment; declaration of unavailability to the aggregator. Corrective maintenance of AC, DC equipment; Warranty management and regulatory inspections; Relationship with EDF Power Solutions and the network manager; Maintaining battery performance: availability, SOH, RTE, auxiliary consumption.
EDF Power Solutions reserves the option to withdraw services related to DC and/or AC equipment in Execution and/or O&M at the time of consultation.
For confidentiality reasons, documents dedicated to this procurement notice and your response must be sent to the following site https://pha.edf.com (AVIS026238), after the validation of a confidentiality agreement.


LOT-0001
BPM021334
Perquie Lot 3: BOP with AC & DC/AC O&M (engineering, equipment procurement, construction, commissioning and O&M).
The bidder's scope for the Perquie Battery Energy Storage System (BESS) project, includes engineering, procurement of all equipment (excluding DC block), construction, and operation and maintenance (O&M).
Battery usable capacity approximately 130MWh at the beginning of life / Battery power approximately 65MW at POC 63 KV / Technology: LFP (lithium iron phosphate)
Estimated COD: August 2028
The bidder must respond to the engineering scope, producing detailed execution plans for all components of the Power Plant. They must address the work scope, which will include complete or partial site preparation, supply, and installation of AC block equipment (PCS, skid, control command), installation of DC equipment provided by the project owner integrating them into their calculations, ensuring supply chain management, their installation on site, and their connection.
The bidder must respond to the O&M scope. The operation and maintenance of the site will be based on an estimated duration of 20 years, during which the client may decide to terminate the contract for convenience without cost. The provider must account for all technical characteristics of the project related to the execution phase. During this contract period, the provider will receive an annual lump-sum remuneration based on their tariff offer which will include:
Operation, 24/7 supervision with remote alarm acknowledgment and site security; Preventive maintenance of AC, DC equipment; declaration of unavailability to the aggregator. Corrective maintenance of AC, DC equipment; Warranty management and regulatory inspections; Relationship with EDF Power Solutions and the network manager; Maintaining battery performance: availability, SOH, RTE, auxiliary consumption.
EDF power solutions reserves the option to withdraw services related to DC and/or AC equipment in Execution and/or O&M at the time of consultation.
For confidentiality reasons, documents dedicated to this procurement notice and your response must be sent to the following site https://pha.edf.com (AVIS026238), after the validation of a confidentiality agreement.

The Buyer:
EDF power solutions
Additional information:
Link:
Additional document: _DEFAULT_VALUE_CHANGE_ME_
Link:
Download Full Notice as PDF
Link:
View Full Notice
CPV Code(s):
45000000 - Construction work
65320000 - Operation of electrical installations