The subject of this tender is the converter and transformer technology including cable connections including HVAC services and the expansion of both electrical operating rooms for the shore power system at the Hafencity Cruise Center as part of the shore power project in the port
The scope of services includes the execution planning, delivery, construction and installation of the plant technology required for the operation of the shore power plant. The scope of services also includes electrical systems and components, inventory planning, warranty phase and optionally maintenance commissioned at a later date.
The scope of services does not include the cable management system, the energy chain, two
Pit boxes (plug shafts) and two transfer vehicles. These are published in a separate
Tender considered. The technical interface will be defined in more detail in the tender documents. The laying of empty conduit routes in public spaces as well as services relating to ship connection systems and construction of building construction are not part of this tender.