Procurement of 3 Electric Buses with Charging Infrastructure | Tenderlake

Procurement of 3 Electric Buses with Charging Infrastructure

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
23 March 2026
Closing Date:
15 May 2026
Location(s):
DE265 Bad Kissingen (DE Germany/DEUTSCHLAND)
Assessment:
This notice contains 1 positive AI Assessment(s) of your products/services' relevance for this procurements.  
Sign in to Tenderlake with your Pro or Primary account to read the assessments.
Description:
Procurement includes three electric buses with specific accessibility features and charging infrastructure, requiring compliance with various regulations and specifications.

Procurement of 3 electric buses with charging infrastructure
Requirements according to bus funding based on the Bavarian Municipal Transport Financing Act (BayGVFG) subject to funding confirmation
Fulfillment of the requirements according to § 42 PBefG and Public Transport Funding Guidelines and Regulation (EC No. 661/2009)
Compliance of the buses with § 30d StVZO
Length: 11.50 to max. 12.30 meters
At least 38 seats, at least 85 passenger spaces
Low-floor equipment
Accessibility Features
2 doors at the front and rear, double-width middle doors
Vehicle lift and lowering function
Ramp for mobility-impaired passengers
Requirement for equipment with WLAN, in particular BayernWLAN
Indication of the earliest possible delivery date!
with charging infrastructure (please itemize separately) - see Lot 2


LOT-0001
Procurement of 3 electric buses.
Procurement of 3 electric buses with charging infrastructure
Requirements according to bus funding based on the Bavarian Municipal Transport Financing Act (BayGVFG) subject to funding confirmation
Fulfillment of the requirements according to § 42 PBefG and Public Transport Funding Guidelines and Regulation (EC No. 661/2009)
Compliance of the buses with § 30d StVZO
Length: 11.50 to max. 12.30 meters
At least 38 seats, at least 85 passenger spaces
Low-floor equipment
Range of at least 250 kilometers
Accessibility Features
2 doors at the front and rear, double-width middle doors
Vehicle lift and lowering function
Ramp for mobility-impaired passengers
Requirement for equipment with WLAN, in particular BayernWLAN
Indication of the earliest possible delivery date!
with charging infrastructure (please itemize separately) - see Lot 2


LOT-0002
Charging infrastructure for charging 3 electric buses - see Lot 1.
Charging infrastructure for 3 electric buses
3 charging stations with 1 charging point each
with at least 7 meters of charging cable with corresponding charging plug
at least 75 KW charging power per charging point or more
optional at least 160 KW charging power per charging point

The Buyer:
Seger AG Omnibusunternehmen
Additional information:
Link:
View Full Notice
Link:
Download Full Notice as PDF
Link:
Additional document: AV276F96-EU Los 1
Link:
Additional document: AV276F96-EU Los 2
CPV Code(s):
31158000 - Chargers
31158100 - Battery chargers
34144910 - Electric buses