The new medium voltage system will be planned as a customer-owned facility. It consists of a medium voltage switchgear with tap-in feeding, 1 outgoing field, and 1 transformer. The rough power demand is approximately 1400 kVA. The system will be designed for a maximum capacity of 1600 kVA, with the transformer connected at 1600 kVA. A remote control device for network-side management of the energy generation systems will be considered in the planning. Given the currently planned capacity of renewable energies, a network and system protection (NA protection) is sufficient. The central decoupling protection between the generating system and grid closure (on the MS side) has also been planned.
This also includes the UPS with a bridging time of 8h.
Milestone dates and contents of the construction execution
1. Start of work approx. 15.06.26
2. Completion of TSH 13.08.27
3. Completion of renovation and sauna construction 26.11.27 (including commissioning, trial operation, partial/comprehensive acceptance, rework)
LOT-0000
BLH, MidSommerland, Medium Voltage System (XA-25/0007-053.2/TSB).
The new medium voltage system will be planned as a customer-owned facility. It consists of a medium voltage switchgear with tap-in feeding, 1 outgoing field, and 1 transformer. The rough power demand is approximately 1400 kVA. The system will be designed for a maximum capacity of 1600 kVA, with the transformer connected at 1600 kVA. A remote control device for network-side management of the energy generation systems will be considered in the planning. Given the currently planned capacity of renewable energies, a network and system protection (NA protection) is sufficient. The central decoupling protection between the generating system and grid closure (on the MS side) has also been planned.
This also includes the UPS with a bridging time of 8h.
Milestone dates and contents of the construction execution
1. Start of work approx. 15.06.26
2. Completion of TSH 13.08.27
3. Completion of renovation and sauna construction 26.11.27 (including commissioning, trial operation, partial/comprehensive acceptance, rework)