Storage S04_Donauried | Tenderlake

Storage S04_Donauried

Contract Value:
EUR 4M - 4M
Notice Type:
Contract Notice
Published Date:
24 July 2026
Closing Date:
28 August 2026
Location(s):
DE11D Ostalbkreis (DE Germany/DEUTSCHLAND)
Assessment:
This notice contains 1 positive AI Assessment(s) of your products/services' relevance for this procurements.  
Sign in to Tenderlake with your Pro or Primary account to read the assessments.
Description:
The client seeks a contractor for the turnkey construction of a lithium-ion battery energy storage system with specified power, capacity, efficiency, and operational requirements.

Storage S04_Donauried


LOT-0001
Storage S04_Donauried.
The client intends the turnkey construction of an industrial battery energy storage system (BESS) with the following target parameters:
• Rated power (charge/discharge): 10 MW
• Usable capacity: 20 MWh (alternatively 40 MWh – 4h system)
• Round-trip efficiency (RTE): ≥ 90 % (preferably 95%)
• Battery technology: Lithium-ion (LFP preferred) - alternatively partly sodium
• Lifetime: ≥ 15 years / ≥ 10,950 cycles at 2 cycles/day
• SOH requirement: ≥ 65 % after 15 years
• Application area: Multimarket (frequency control reserve, intraday, peak shaving, FCR/aFRR, arbitrage, etc.), contingency reserve
• Grid connection: 20 kV medium voltage
at the following location (see site plan): GPS: 48.44615583008373, 10.10022126790465, parcel 773, district Oberelchingen.

The contractor shall assume planning, delivery, construction, assembly, commissioning, documentation, and technical operation including defined guarantees.

The Buyer:
Netze ODR GmbH
Additional information:
Link:
Additional document: n/a
Link:
View Full Notice
Link:
Download Full Notice as PDF
CPV Code(s):
45315300 - Electricity supply installations