Pipeline Construction (Project Store2REPower) | Tenderlake

Pipeline Construction (Project Store2REPower)

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
08 January 2026
Closing Date:
02 February 2026
Location(s):
DEA23 Köln, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
The project involves expanding the TESIS facility to conduct liquid salt heater tests, requiring the prefabrication, delivery, assembly, and insulation of a piping system for liquid salt lines, along with additional services related to equipment setup and system adaptation.

As part of the Store2REPower project funded by the Federal Ministry for Economic Affairs and Climate Action (BMWK), DLR conducts liquid salt heater tests with the existing test facility for thermal energy storage in molten salts (TESIS:store – short "TESIS") at the location. To carry out the tests, the TESIS facility (see Figure 1, left) will be expanded with a new test platform "TESIS:store.extended" (see Figure 1, right). For the Store2REPower project, a test setup with liquid salt electric heaters will be installed and tested in the test platform. The tests are planned for a period of approximately 120 days.

This performance description refers to the prefabrication, delivery, assembly, and insulation of a piping system for liquid salt lines. Furthermore, additional services related to interfaces, equipment setup, and EMSR technology, as well as adaptation work at the interface to the existing system and within the existing facility (TESIS), must be provided.


LOT-0001
LOT-0001 320/2026/9072594 (3)
Pipeline Construction (Project Store2REPower).
As part of the Store2REPower project funded by the Federal Ministry for Economic Affairs and Climate Action (BMWK), DLR conducts liquid salt heater tests with the existing test facility for thermal energy storage in molten salts (TESIS:store – short "TESIS") at the location. To carry out the tests, the TESIS facility (see Figure 1, left) will be expanded with a new test platform "TESIS:store.extended" (see Figure 1, right). For the Store2REPower project, a test setup with liquid salt electric heaters will be installed and tested in the test platform. The tests are planned for a period of approximately 120 days.

This performance description refers to the prefabrication, delivery, assembly, and insulation of a piping system for liquid salt lines. Furthermore, additional services related to interfaces, equipment setup, and EMSR technology, as well as adaptation work at the interface to the existing system and within the existing facility (TESIS), must be provided.

The Buyer:
Deutsches Zentrum für Luft- und Raumfahrt e.V. (DLR)
Additional information:
Link:
View Full Notice
Link:
Additional document: E67885464
Link:
Download Full Notice as PDF
CPV Code(s):
14622000 - Steel