Direct Supplies of Transformers for BESS Projects | Tenderlake

Direct Supplies of Transformers for BESS Projects

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
04 May 2026
Closing Date:
02 June 2026
Location(s):
PL POLSKA (PL Poland/POLSKA)
Description:
Direct supplies of HV/MV transformers for BESS projects include transportation, placement, technical support, and testing, with options for partial offers across three parts totaling five transformers.

The subject of the order includes direct supplies of transformers for BESS projects. The delivery includes the execution of HV/MV transformers, their transport to locations indicated by the Ordering Party in the provinces of Lubusz, Greater Poland, West Pomerania, unloading, moving, and placing the transformers in positions or locations previously prepared by the EPC contractor (General Contractor in the EPC formula - Engineering, Procurement, Construction) or other entity acting on behalf of the Ordering Party, transfer of required technical, quality, and operational documentation, conducting Factory Acceptance Tests (FAT), providing transport, unloading, storage, connection, and external instructions, connection, integration and commissioning activities, as well as providing technical support and technological supervision over connection, integration, and commissioning activities carried out by the EPC contractor or other entity acting on behalf of the Ordering Party. The supplier is also obliged to perform post-delivery, unloading, moving, and placing control of the transformer, as well as appropriate measurements and tests confirming that during transport and handling no damage to the transformer or deterioration of its technical condition occurred. The description of the subject of the order (hereinafter referred to as “OPZ”) constitutes Part 2 of the Terms of Reference.
The order includes the delivery of a total of 5 transformers and is divided into three parts:
Part 1 – supply of 2 transformers with a capacity of 50 MVA,
Part 2 – supply of 2 transformers with a capacity of 75 MVA,
Part 3 – supply of 1 transformer with a capacity of 100 MVA.
The Ordering Party requires indicating the parameters of the offered devices in the Bid Form attached as Annex No. 1 to the Terms of Reference. The Ordering Party allows the possibility of submitting partial offers. The Ordering Party does not foresee restrictions regarding the maximum number of parts for which the order may be awarded to the same contractor. The contractor may submit an offer for one, two, or three parts of the subject of the order. The execution of the subject of the order for all parts of the subject of the order is 48 months from the date of signing the Agreement – in accordance with the Agreement and the OPZ.
The Ordering Party, regarding Parts 1 and 2 of the subject of the order, provides the possibility to use the option right in accordance with Article 441 of the Public Procurement Law, increasing the scope of the order to include the delivery of a total of 6 transformers, including:
- For Part 1 – an additional 3 transformers with a capacity of 50 MVA,
- For Part 2 – an additional 3 transformers with a capacity of 75 MVA.


LOT-0001
OFZ.ORR-KCh.2100.3.2026 – Part I: “Supply of 2 transformers with a capacity of 50 MVA”
Part I: “Supply of 2 transformers with a capacity of 50 MVA”.
Direct supplies of transformers for BESS projects include the execution of HV/MV transformers, their transport to locations indicated by the Ordering Party in the provinces of Lubusz, Greater Poland, West Pomerania, unloading, moving, and placing the transformers in positions or locations previously prepared by the EPC contractor (General Contractor in the EPC formula - Engineering, Procurement, Construction) or other entity acting on behalf of the Ordering Party, transfer of required technical, quality, and operational documentation, conduct Factory Acceptance Tests (FAT), provide transport, loading, unloading, storage, connection and external instructions, connection, integration and commissioning activities and ensure technical support and technological supervision over connection, integration and commissioning activities carried out by the EPC contractor or other entity acting on behalf of the Ordering Party. The supplier is also required to perform control after delivery, unloading, moving and placement of the transformer and appropriate measurements and tests confirming that during transport and handling no damage to the transformer or impairment of its technical condition occurred. The description of the subject of the order (hereinafter referred to as “OPZ”) constitutes Part 2 of the Terms of Reference. The Ordering Party requires indicating the parameters of the offered devices in the Bid Form attached as Annex No. 1 to the Terms of Reference.
The Ordering Party allows the possibility of submitting partial offers. The Ordering Party does not foresee restrictions regarding the maximum number of parts for which the order may be awarded to the same contractor. The contractor may submit an offer for one, two, or three parts of the subject of the order. The execution of the subject of the order for all parts of the subject of the order is 48 months from the date of signing the agreement.


LOT-0002
OFZ.ORR-KCh.2100.3.2026 - Part II: “Supply of 2 transformers with a capacity of 75 MVA”
Part II: “Supply of 2 transformers with a capacity of 75 MVA”.
Direct supplies of transformers for BESS projects include the execution of HV/MV transformers, their transport to locations indicated by the Ordering Party in the provinces of Lubusz, Greater Poland, West Pomerania, unloading, moving, and placing the transformers in positions or locations previously prepared by the EPC contractor (General Contractor in the EPC formula - Engineering, Procurement, Construction) or other entity acting on behalf of the Ordering Party, transfer of required technical, quality, and operational documentation, conduct Factory Acceptance Tests (FAT), provide transport, loading, unloading, storage, connection and external instructions, connection, integration and commissioning activities and ensure technical support and technological supervision over connection, integration and commissioning activities carried out by the EPC contractor or other entity acting on behalf of the Ordering Party. The supplier is also required to perform control after delivery, unloading, moving and placement of the transformer and appropriate measurements and tests confirming that during transport and handling no damage to the transformer or impairment of its technical condition occurred. The description of the subject of the order (hereinafter referred to as “OPZ”) constitutes Part 2 of the Terms of Reference. The Ordering Party requires indicating the parameters of the offered devices in the Bid Form attached as Annex No. 1 to the Terms of Reference.
The Ordering Party allows the possibility of submitting partial offers. The Ordering Party does not foresee restrictions regarding the maximum number of parts for which the order may be awarded to the same contractor. The contractor may submit an offer for one, two, or three parts of the subject of the order. The execution of the subject of the order for all parts of the subject of the order is 48 months from the date of signing the agreement.


LOT-0003
OFZ.ORR-KCh.2100.3.2026 - Part III: “Supply of 1 transformer with a capacity of 100 MVA”
Part III: “Supply of 1 transformer with a capacity of 100 MVA”.
Direct supplies of transformers for BESS projects include the execution of HV/MV transformers, their transport to locations indicated by the Ordering Party in the provinces of Lubusz, Greater Poland, West Pomerania, unloading, moving, and placing the transformers in positions or locations previously prepared by the EPC contractor (General Contractor in the EPC formula - Engineering, Procurement, Construction) or other entity acting on behalf of the Ordering Party, transfer of required technical, quality, and operational documentation, conduct Factory Acceptance Tests (FAT), provide transport, loading, unloading, storage, connection and external instructions, connection, integration and commissioning activities and ensure technical support and technological supervision over connection, integration and commissioning activities carried out by the EPC contractor or other entity acting on behalf of the Ordering Party. The supplier is also required to perform control after delivery, unloading, moving and placement of the transformer and appropriate measurements and tests confirming that during transport and handling no damage to the transformer or impairment of its technical condition occurred. The description of the subject of the order (hereinafter referred to as “OPZ”) constitutes Part 2 of the Terms of Reference. The Ordering Party requires indicating the parameters of the offered devices in the Bid Form attached as Annex No. 1 to the Terms of Reference.
The Ordering Party allows the possibility of submitting partial offers. The Ordering Party does not foresee restrictions regarding the maximum number of parts for which the order may be awarded to the same contractor. The contractor may submit an offer for one, two, or three parts of the subject of the order. The execution of the subject of the order for all parts of the subject of the order is 48 months from the date of signing the agreement.

The Buyer:
ENEA Nowa Energia sp. z o.o.
Additional information:
Link:
Download Full Notice as PDF
Link:
View Full Notice
Link:
Additional document: OFZ.ORR-KCh.2100.3.2026
CPV Code(s):
31160000 - Parts of electric motors, generators and transformers
31170000 - Transformers
31171000 - Liquid dielectric transformers
31172000 - Voltage transformers
31173000 - Instrument transformer
31174000 - Power supply transformers
45317200 - Electrical installation work of transformers
51111300 - Installation services of transformers