The contract pertains to the preventive and corrective maintenance and, where necessary, replacement of power switches and the preventive and corrective maintenance of MCCs within the scope of the awarded service, such as WTPs, sewage pumping stations, pressure stations, surface pumping stations, sluices, and utility buildings. The first part of the contract includes an inventory of brands for which an arc flash calculation must be performed immediately. Based on the inventory, the contractor will develop a maintenance schedule. The second part of the contract includes the inspection and maintenance of the power switches and MCCs. The estimated duration is 60 months, with an option for extension of 5 times 12 months.
LOT-0000
1
Maintenance of MCCs and Power Switches.
The contract pertains to the preventive and corrective maintenance and, where necessary, replacement of power switches and the preventive and corrective maintenance of MCCs within the scope of the awarded service, such as WTPs, sewage pumping stations, pressure stations, surface pumping stations, sluices, and utility buildings. The first part of the contract includes an inventory of brands for which an arc flash calculation must be performed immediately. Based on the inventory, the contractor will develop a maintenance schedule. The second part of the contract includes the inspection and maintenance of the power switches and MCCs. The estimated duration is 60 months, with an option for extension of 5 times 12 months.