- Rehabilitation and modernization of the road system of Fermelor Street, over a total length of approximately 2,370 m, by reconstructing the foundation, road layers, and asphalt pavement, to ensure load-bearing capacity and durability in operation.
- Modernization of sidewalks and pedestrian accesses along the street, including adaptation for persons with disabilities, to increase pedestrian safety and comfort.
- Implementation of road safety measures, through vertical and horizontal signage works, protective barriers, markings, and traffic equipment.
- Installation of street equipment and fittings necessary for the functionality and comfort of the public space (urban furniture, delimitation elements, equipment related to public lighting).
- Landscaping of green areas adjacent to the street, over an area of approximately 3,489 sqm, through land preparation works, grass seeding, and planting of decorative trees and shrubs, for the visual integration of the investment and improvement of urban environmental quality.
LOT-0000
Default lot.
The general objective: of the project is to increase sustainable urban mobility and the efficiency of public transport in Piatra Neamț Municipality, by modernizing road and pedestrian infrastructure, implementing an integrated intelligent traffic management system, and arranging green and bike infrastructure along the mobility corridor Bd. General Nicolae Dăscălescu – Str. Dimitrie Leonida. The project contributes to achieving the specific objective RSO 2.8 – “Promoting sustainable multimodal urban mobility, as part of the transition toward a low-carbon economy,” through implementing modern and efficient infrastructure that facilitates the circulation of public transport and car traffic under conditions of comfort and safety, while ensuring the landscape integration of the mobility corridor through green arrangements.
According to art. 160 para. (2) of Law no. 98/2016 on public procurement (as amended by the Government Emergency Ordinance no. 107/2017), correlated with the provisions of art. 27 of Government Decision no. 395/2016, the contracting authority will respond to clarification requests (if received on time), 20 days before the deadline set for bid submission in the Participation Announcement.
Number of days until which clarifications can be requested before the bid submission deadline: 30 days