The subject of the contract is: "Construction of power supply infrastructure for the Port Polska investment, including RPZ buildings (110 kV/15 kV), GPO-C station building (110 kV/15 kV), power generator station buildings, and 110 kV cable lines connecting the Port Polska investment to the national power grid." The contract subject has been divided into 7 Tasks, all of which will be subject to a single Agreement.
The detailed subject of the contract is described in the Description of Needs and Requirements (OPW).
LOT-0001
FZA.2510.32.2026/RPI/70
Construction of power supply infrastructure for the Port Polska investment, including RPZ buildings (110 kV/15 kV), GPO-C station building (110 kV/15 kV), power generator station buildings, and 110 kV cable lines connecting the Port Polska investment to the national power grid.
I. The subject of the contract is: "Construction of power supply infrastructure for the Port Polska investment, including RPZ buildings (110 kV/15 kV), GPO-C station building (110 kV/15 kV), power generator station buildings, and 110 kV cable lines connecting the Port Polska investment to the national power grid." The contract subject has been divided into 7 Tasks, all of which will be subject to a single Agreement.
II. Division of the Contract into Tasks:
2.1. Task 1 - execution of construction works and necessary design works for the connection to the 110/110 kV PGE Station, including 110 kV lines on the eastern and southern side of the airport;
2.2. Task 2 - execution of construction works and necessary design works for the Switching Power Supply Point station: RPZ-1 with SCADA system;
2.3. Task 3 - execution of construction works and necessary design works for the Switching Power Supply Point station: RPZ-2 with SCADA system;
2.4. Task 4 - execution of construction works and necessary design works for the Switching Power Supply Point station: RPZ-3 with SCADA system;
2.5. Task 5 - execution of construction works and necessary design works for the Switching Power Supply Point station: RPZ-4 with SCADA system;
2.6. Task 6 - execution of construction works and necessary design works for the connection to the 400/110 kV PSE Station, including 110 kV lines on the western and northern side of the airport;
2.7. Task 7 - execution of construction works and necessary design works for the GPO-C station along with connection to the 110 kV network and SCADA system.
III. The detailed subject of the contract is described in the OPW.