The assignment concerns the realization and long-term operation of a logistics charging square, namely Logistics Charging Square BT A12. The concessionaire is required to realize the charging square at the corner of Bonnetstraat/Boylestraat in Ede, near the Schutterweg roundabout (parcel 41b, cadastral known as F10430 in Ede). After the realization phase, the operational basis of a charging square for logistics vehicles will be available, which will then develop during the operational phase into a fully functional and operational charging square with full availability for the described target groups.
• Fast charging and slow charging of ongoing electric freight traffic;
• Slow charging (at lower power) of electric trucks from the companies on BT A12 and surrounding business parks (Kievitsmeent, Frankeneng, and Heestereng);
• Charging facilities for city logistics vehicles (over 3,500 kg) in connection with the implementation of the Zero Emission Zone (ZES zone) in Ede by 2030;
• (Construction) materials for clean and emission-free building. See procurement documents.
LOT-0000
1
Logistics Charging Square BT A12.
The assignment concerns the realization and long-term operation of a logistics charging square, namely Logistics Charging Square BT A12. The concessionaire is required to realize the charging square at the corner of Bonnetstraat/Boylestraat in Ede, near the Schutterweg roundabout (parcel 41b, cadastral known as F10430 in Ede). After the realization phase, the operational basis of a charging square for logistics vehicles will be available, which will then develop during the operational phase into a fully functional and operational charging square with full availability for the described target groups.
• Fast charging and slow charging of ongoing electric freight traffic;
• Slow charging (at lower power) of electric trucks from the companies on BT A12 and surrounding business parks (Kievitsmeent, Frankeneng, and Heestereng);
• Charging facilities for city logistics vehicles (over 3,500 kg) in connection with the implementation of the Zero Emission Zone (ZES zone) in Ede by 2030;
• (Construction) materials for clean and emission-free building. See procurement documents.