This project will enable closer collaboration with the research organizations with which METROFOOD-RO is built, as well as with organizations within METROFOOD-RI. The national organization will be similar, as much as possible, to the European level within METROFOOD-RI, with minor specifics due to the complexity of the network, which will allow the Romanian node to function more easily. The sustainability of the METROFOOD-RO network will also be based on the architecture of the infrastructure we want to develop through various projects, on the development of services that we identify as necessary both at the national level and at the METROFOOD-RI and European level. METROFOOD-RO will provide knowledge and technology transfer through R&D services, laboratory analyses, consultancy and technical assistance, specialized professional training, etc., to actors in the food chain.
Complete details regarding the technical specifications and requirements associated with each equipment are presented in Form No. 8 in the files: 8.1 Form_TECHNICAL_PROPOSAL_LOT_1.doc; 8.2 Form_TECHNICAL_PROPOSAL_LOT_2.doc. These are an integral part of the Specification Book and are mandatory for bidders in preparing their offers.
Requested delivery time: 60 days. This is in addition to the warranty period for the products, a minimum of 24 months.
The deadline by which economic operators can request clarifications, in accordance with the provisions of art.160 para. (1) of Law no. 98/2016, is 10 days before the deadline for submitting offers set for sending clarification requests. The contracting authority will respond clearly and completely to all requests for clarifications/additional information (if received in time), in accordance with the provisions of art.161 of Law no. 98/2016, 6 days before the deadline for submitting offers.
Any request for clarifications must be sent via SEAP (http://sicap-prod.e-licitatie.ro/pub).
LOT-0001
Microwave extraction system.
This project will be realized by modernizing and adapting the existing research infrastructure through the acquisition of specific equipment for the preparation and analysis of plant-based products. This project aims at the purchase of tangible assets (equipment/furnishings), intangible assets (integrated software for operating equipment). The equipment subject to this procedure is:
- Microwave extractor – 1 piece
Complete details regarding the technical specifications and requirements associated with this equipment are presented in Form No. 8 in the file: 8.1 Form_TECHNICAL_PROPOSAL_LOT_1.doc. This is an integral part of the award documentation and is mandatory for bidders in preparing their offers.
The contract duration is 60 calendar days. This is in addition to the warranty period for the works, a minimum of 24 months.
LOT-0002
Analysis system.
This project will be realized by modernizing and adapting the existing research infrastructure through the acquisition of specific equipment for the preparation and analysis of plant-based products. This project aims at the purchase of tangible assets (equipment/furnishings), intangible assets (integrated software for operating equipment). In this sense, the following will be purchased:
- System for analyzing primary and secondary metabolites - 1 piece.
The analysis system to be purchased based on the contract awarded through this public procurement procedure must be compatible with the existing system in the laboratory, which contains:
- HPLC analytical pump (specifications according to the specifications from point 3.1 of the Requested Products from the Specification Book)
- Mass spectrometer (specifications according to the specifications from point 3.1 of the Requested Products from the Specification Book)
Complete details regarding the technical specifications and requirements associated with this equipment are presented in Form No. 8 in the file: 8.1 Form_TECHNICAL_PROPOSAL_LOT_2.doc. This is an integral part of the award documentation and is mandatory for bidders in preparing their offers.
The contract duration is 60 calendar days. This is in addition to the warranty period for the works, a minimum of 24 months.