1. The subject of the order is the delivery of brand new electric buses along with charging stations.
2. The scope of the order includes:
1) Delivery of 60 units of brand new, single-section, low-floor, two-axle city buses of one brand and type, structurally adapted for right-hand traffic, powered by electric motors, charged via a plug-in connector, hereinafter referred to as electric buses, along with electronic equipment (dedicated devices and systems), necessary software or access to electronic platforms and documentation. As part of the delivery of buses, training for drivers, technical support staff, and representatives of the contracting authority is required regarding the operation and maintenance of the delivered vehicles and devices.
2) Delivery, construction of foundations and anti-ram protections, installation and commissioning, including performing the required inspections as per separate regulations, 15 stationary bus charging stations (chargers), namely: 6 single-point and 9 double-point, enabling the charging of batteries in electric buses, along with the provision of computer software or access to an electronic platform, allowing, among other things, current monitoring of energy consumption for the charging stations and buses. As part of the delivery of charging stations, training for technical support staff and representatives of the contracting authority is required regarding the operation, maintenance, and oversight of the delivered devices. Installation and commissioning will take place at three locations - at bus depots;
3) Providing a guarantee for the delivered vehicles and charging stations.
LOT-0001
BKM-I.271.5.2025
Delivery of 60 electric city buses and charging stations.
1. The subject of the order is the delivery of brand new electric buses along with charging stations.
2. The scope of the order includes:
1) Delivery of 60 units of brand new, single-section, low-floor, two-axle city buses of one brand and type, structurally adapted for right-hand traffic, powered by electric motors, charged via a plug-in connector, hereinafter referred to as electric buses, along with electronic equipment (dedicated devices and systems), necessary software or access to electronic platforms and documentation. As part of the delivery of buses, training for drivers, technical support staff, and representatives of the contracting authority is required regarding the operation and maintenance of the delivered vehicles and devices.
2) Delivery, construction of foundations and anti-ram protections, installation and commissioning, including performing the required inspections as per separate regulations, 15 stationary bus charging stations (chargers), namely: 6 single-point and 9 double-point, enabling the charging of batteries in electric buses, along with the provision of computer software or access to an electronic platform, allowing, among other things, current monitoring of energy consumption for the charging stations and buses. As part of the delivery of charging stations, training for technical support staff and representatives of the contracting authority is required regarding the operation, maintenance, and oversight of the delivered devices. Installation and commissioning will take place at three locations - at bus depots;
3) Providing a guarantee for the delivered vehicles and charging stations.