Construction of Battery Systems in the HSE Group | Tenderlake

Construction of Battery Systems in the HSE Group

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
27 April 2026
Closing Date:
15 May 2026
Location(s):
SIZZZ Extra-Regio NUTS 3 (SI Slovenia/SLOVENIJA)
Assessment:
This notice contains 1 positive AI Assessment(s) of your products/services' relevance for this procurements.  
Sign in to Tenderlake with your Pro or Primary account to read the assessments.
Description:
The procurement involves the design, supply, installation, commissioning, and maintenance of battery storage systems for the HSE Group, including necessary project documentation and outdoor installations near existing electrical infrastructure, with project orders based on client needs.

The subject of the public procurement is the design, supply, installation, commissioning, and maintenance of battery storage systems in the HSE Group. The order includes the preparation and submission of all necessary project documentation (PZI, PID, DZO) and includes all activities necessary for the successful acquisition of a use permit. Battery storage systems will be installed outdoors at various locations near the existing electrical infrastructure of the HSE Group.

The listed projects represent provisional projects, and the contracting authority is not obliged to place all projects. Actual project orders will depend on the actual needs of the client.

A more detailed specification of the order (minimum technical requirements) can be found in the list of technical data - the technical part of the documentation related to the public procurement (hereinafter: technical part/closed part), which interested bidders can obtain according to the rules of the documentation related to the public procurement.

Access to the closed part of the documentation related to the public procurement is a condition for submitting a bid.

The contracting authority wishes: - to receive bids based on which a framework agreement will be concluded for a period of forty (40) months or until the maximum estimated contract value under the framework agreement is exhausted, with the reservation of the right i.e., with the possibility of extending the validity period of the framework agreement if the maximum estimated value is not exhausted/achieved within forty (40) months, with no more than three (3) bidders whose bids are admissible and based on the criterion of the most favorable; - to select a supplier for the delivery of goods for the first individual order from the most favorable final admissible bid from the negotiation procedure with publication among the suppliers with whom a framework agreement is concluded.

The rules related to the method of submitting public procurement are described in detail in the section on the Method of Submitting Public Procurement in the documentation related to the public procurement.


LOT-0000
Construction of Battery Systems in the HSE Group.
The subject of the public procurement is the design, supply, installation, commissioning, and maintenance of battery storage systems in the HSE Group. The order includes the preparation and submission of all necessary project documentation (PZI, PID, DZO) and includes all activities necessary for the successful acquisition of a use permit. Battery storage systems will be installed outdoors at various locations near the existing electrical infrastructure of the HSE Group.

The listed projects represent provisional projects, and the contracting authority is not obliged to place all projects. Actual project orders will depend on the actual needs of the client.

A more detailed specification of the order (minimum technical requirements) can be found in the list of technical data - the technical part of the documentation related to the public procurement (hereinafter: technical part/closed part), which interested bidders can obtain according to the rules of the documentation related to the public procurement.

Access to the closed part of the documentation related to the public procurement is a condition for submitting a bid.

The contracting authority wishes: - to receive bids based on which a framework agreement will be concluded for a period of forty (40) months or until the maximum estimated contract value under the framework agreement is exhausted, with the reservation of the right i.e., with the possibility of extending the validity period of the framework agreement if the maximum estimated value is not exhausted/achieved within forty (40) months, with no more than three (3) bidders whose bids are admissible and based on the criterion of the most favorable; - to select a supplier for the delivery of goods for the first individual order from the most favorable final admissible bid from the negotiation procedure with publication among the suppliers with whom a framework agreement is concluded.

The rules related to the method of submitting public procurement are described in detail in the section on the Method of Submitting Public Procurement in the documentation related to the public procurement.

The Buyer:
HOLDING SLOVENSKE ELEKTRARNE d.o.o.
Additional information:
Link:
View Full Notice
Link:
Additional document: DocLot0
Link:
Download Full Notice as PDF
CPV Code(s):
31440000 - Batteries