The subject of this tender is the planning services for the establishment and commissioning of a heat pump system (consisting of at least two individual heat pumps that utilize the refrigerant ammonia) at the wastewater treatment plant with a thermal performance of approximately 15 MWth. This heat pump system extracts heat from the treated wastewater (clear water) and feeds it into the heating network. For this project, two buildings with plant and control engineering technology, as well as a connecting source line, are to be constructed.
LOT-0001
Lot 1 - Technical building with heat pump systems, control engineering technology.
Lot 1 - Technical building with heat pump systems, control engineering technology: The scope of services includes the basic services of service phases 5 to 8 according to §§ 55ff and Appendix 15 HOAI for the plant and control engineering technology as well as object and structural planning for the technical building according to §§ 34ff and Appendix 10 HOAI and §§ 51ff and Appendix 14 HOAI, including special services. Lot 2 - Source line: The scope of services includes the basic services of service phases 5 to 8 according to §§ 43ff engineering structures and Appendix 12 for deep and pipeline construction as well as special services. Lot 3 - Extraction pump station with plant and control engineering technology: The scope of services includes the basic services of service phases 5 to 8 according to §§ 55ff and Appendix 15 HOAI for the plant and control engineering technology and object and structural planning for the extraction pump station according to §§ 43ff and Appendix 12 HOAI and §§ 51ff and Appendix 14 HOAI, including special services. The start of construction for the project is planned for 2028. The intended start of planning and the invitations to tender for construction services are based on the information in the project schedule.
LOT-0002
Lot 2 - Source line.
Lot 1 - Technical building with heat pump systems, control engineering technology: The scope of services includes the basic services of service phases 5 to 8 according to §§ 55ff and Appendix 15 HOAI for the plant and control engineering technology as well as object and structural planning for the technical building according to §§ 34ff and Appendix 10 HOAI and §§ 51ff and Appendix 14 HOAI, including special services. Lot 2 - Source line: The scope of services includes the basic services of service phases 5 to 8 according to §§ 43ff engineering structures and Appendix 12 for deep and pipeline construction as well as special services. Lot 3 - Extraction pump station with plant and control engineering technology: The scope of services includes the basic services of service phases 5 to 8 according to §§ 55ff and Appendix 15 HOAI for the plant and control engineering technology as well as object and structural planning for the extraction pump station according to §§ 43ff and Appendix 12 HOAI and §§ 51ff and Appendix 14 HOAI, including special services. The start of construction for the project is planned for 2028. The intended start of planning and the invitations to tender for construction services are based on the information in the project schedule.
LOT-0003
Lot 3 - Extraction pump station with plant and control engineering technology.
Lot 1 - Technical building with heat pump systems, control engineering technology: The scope of services includes the basic services of service phases 5 to 8 according to §§ 55ff and Appendix 15 HOAI for the plant and control engineering technology as well as object and structural planning for the technical building according to §§ 34ff and Appendix 10 HOAI and §§ 51ff and Appendix 14 HOAI, including special services. Lot 2 - Source line: The scope of services includes the basic services of service phases 5 to 8 according to §§ 43ff engineering structures and Appendix 12 for deep and pipeline construction as well as special services. Lot 3 - Extraction pump station with plant and control engineering technology: The scope of services includes the basic services of service phases 5 to 8 according to §§ 55ff and Appendix 15 HOAI for the plant and control engineering technology as well as object and structural planning for the extraction pump station according to §§ 43ff and Appendix 12 HOAI and §§ 51ff and Appendix 14 HOAI, including special services. The start of construction for the project is planned for 2028. The intended start of planning and the invitations to tender for construction services are based on the information in the project schedule.