Intelligent Transport Systems Equipment Frameworks Generation 2 | Tenderlake

Intelligent Transport Systems Equipment Frameworks Generation 2

Contract Value:
EUR 43M - 43M
Notice Type:
Contract Notice
Published Date:
24 June 2026
Closing Date:
28 July 2026
Location(s):
IE061 Dublin (IE IRELAND)
Description:
Transport Infrastructure Ireland is establishing nine framework lots for Intelligent Transport Systems equipment, including support for local authorities to install Periodic School Limit signage, with TII overseeing the framework management and local authorities conducting mini-competitions for procurement.

Transport Infrastructure Ireland (TII) has a requirement to establish nine framework lots under the TII492 Intelligent Transport Systems Equipment Frameworks Generation 2 programme. Lots 1, 2 and 3A to 3F will support TII’s ITS equipment requirements, while Lot 4 will establish a framework to support local authorities in delivering Periodic School Limit signage in accordance with a Government directive. The proposed framework term is four years. The estimated maximum value is €27 million for Lots 1, 2 and 3A to 3F, and €48 million for Lot 4, giving a total estimated maximum value of €75 million across all lots. Lots 1 – 3A to 3F (TII’s requirement for ITS equipment) Transport Infrastructure Ireland (TII) operates and maintains a network of roadside Intelligent Transport Systems (ITS) equipment linked to the Motorway Operations Control Centre (MOCC) in Dublin Tunnel. This infrastructure supports the safe and efficient operation of the national road network. The ITS Equipment Framework will provide the contractual mechanism through which TII may procure ITS equipment, installation services and associated civil works required to maintain, renew and expand the network. Lot 4 (Department of Transport and local authorities requirement for ITS Equipment) A Government directive requires local authorities to install Periodic School Limit (PSL) signs at schools nationwide. Following engagement with the Department of Transport, Lot 4 has been included to establish a framework agreement through which local authorities may procure these works. TII’s role will be limited to establishing the framework agreement and overseeing the eTenders system and monitoring framework ceiling limits. Local authorities will conduct mini-competitions and fund the resulting call-off contracts. TII does not currently expect to use Lot 4 directly, but will retain the option to do so if required.


LOT-0001
Lot 1 multi-supplier framework agreement for ITS equipment exceeding €500,000.
Lot 1 is a multi-supplier framework agreement for ITS equipment exceeding €500,000.
This framework provides for the supply, installation, integration, and commissioning of ITS equipment across the national road network.
Works include the provision and installation of roadside electronic systems (e.g. CCTV, VMS, ANPR, TMUs), together with testing, commissioning, and integration into existing TII and third-party platforms.
The Contractor will be responsible for traffic management, PSCS duties, stakeholder coordination, and integration with TII and third-party systems, and shall ensure that all equipment is operational and compliant with applicable technical, software, cybersecurity, and safety requirements.

The frameworks deliver end-to-end ITS solutions, from supply through to live system operation.


LOT-0002
Lot 2 single-supplier framework agreement for ITS equipment valued at less than €500,000.
Lot 2 is a single-supplier framework agreement for ITS equipment valued at less than €500,000.
This framework provides for the supply, installation, integration, and commissioning of ITS equipment across the national road network.
Works include the provision and installation of roadside electronic systems (e.g. CCTV, VMS, ANPR, TMUs), together with testing, commissioning, and integration into existing TII and third-party platforms.
The Contractor will be responsible for traffic management, PSCS duties, stakeholder coordination, and integration with TII and third-party systems, and shall ensure that all equipment is operational and compliant with applicable technical, software, cybersecurity, and safety requirements.

The frameworks deliver end-to-end ITS solutions, from supply through to live system operation.

Please Note : Transport Infrastructure Ireland (TII) intends to award the framework agreement and the initial call-off contract in parallel to the highest-ranked bidder. Works under the contract will be issued by way of task orders, meaning the appointed contractor will be contractually obliged to deliver the specified works as and when required by TII.
Both the framework agreement and the initial call-off contract will have a duration of four years. However, individual task orders issued during this period may extend beyond the end of the framework term, where permitted under the contract.


LOT-0003
Lot 3A single-supplier framework agreement for Advanced Matrix Indicators (AMI) and Variable Message Signs (VMS).
The scope includes the supply, installation, testing, integration, commissioning, and handover of ITS equipment, comprising:

• Lot 3A: Advanced Matrix Indicators (AMI) and Variable Message Signs (VMS)

The Contractor shall deliver the Works at specified locations, coordinate with relevant stakeholders, and ensure full integration with TII systems.
Responsibilities will include traffic management, PSCS duties, and compliance with all applicable statutory, safety, technical, and operational requirements.

Please note: No call-off contract will be issued immediately upon award of Lot 3A Instead, once a specific requirement is identified, TII will request a quotation from the contractor and, subject to agreement, will enter into a call-off contract.
The call-off contract will remain in place for the remaining duration of the framework. For example, where a call-off contract is established six months after the framework commencement, the contract duration will extend for the remaining three and a half years. This contract will cover the delivery of the initial scope of works and provide for the instruction of additional work, as required, through task orders over its duration.
This approach ensures that contractors are contractually obliged to deliver works as and when required, while avoiding the need for them to maintain insurances, and associated overheads in advance of any confirmed workload.


LOT-0004
Lot 3B single-supplier framework agreement for Cabinets and ancillary equipment.
The scope includes the supply, installation, testing, integration, commissioning, and handover of ITS equipment, comprising:


• Lot 3B: Cabinets and ancillary equipment

The Contractor shall deliver the Works at specified locations, coordinate with relevant stakeholders, and ensure full integration with TII systems.
Responsibilities will include traffic management, PSCS duties, and compliance with all applicable statutory, safety, technical, and operational requirements.

Please note: No call-off contract will be issued immediately upon award of Lot 3B Instead, once a specific requirement is identified, TII will request a quotation from the contractor and, subject to agreement, will enter into a call-off contract.
The call-off contract will remain in place for the remaining duration of the framework. For example, where a call-off contract is established six months after the framework commencement, the contract duration will extend for the remaining three and a half years. This contract will cover the delivery of the initial scope of works and provide for the instruction of additional work, as required, through task orders over its duration.
This approach ensures that contractors are contractually obliged to deliver works as and when required, while avoiding the need for them to maintain insurances, and associated overheads in advance of any confirmed workload.


LOT-0005
Lot 3C single-supplier framework agreement for Traffic Monitoring Units (TMU), Cycle Monitoring Units (CMU), Automatic Incident Detectors (AID).
The scope includes the supply, installation, testing, integration, commissioning, and handover of ITS equipment, comprising:


• Lot 3C: Traffic Monitoring Units (TMU), Cycle Monitoring Units (CMU), Automatic Incident Detectors (AID)

Responsibilities will include traffic management, PSCS duties, and compliance with all applicable statutory, safety, technical, and operational requirements.

Please note: No call-off contract will be issued immediately upon award of Lot 3C Instead, once a specific requirement is identified, TII will request a quotation from the contractor and, subject to agreement, will enter into a call-off contract.
The call-off contract will remain in place for the remaining duration of the framework. For example, where a call-off contract is established six months after the framework commencement, the contract duration will extend for the remaining three and a half years. This contract will cover the delivery of the initial scope of works and provide for the instruction of additional work, as required, through task orders over its duration.
This approach ensures that contractors are contractually obliged to deliver works as and when required, while avoiding the need for them to maintain insurances, and associated overheads in advance of any confirmed workload.


LOT-0006
Lot 3D single-supplier framework agreement for Emergency Roadside Telephones (ERT).
The scope includes the supply, installation, testing, integration, commissioning, and handover of ITS equipment, comprising:

• Lot 3D: Emergency Roadside Telephones (ERT)

The Contractor shall deliver the Works at specified locations, coordinate with relevant stakeholders, and ensure full integration with TII systems.
Responsibilities will include traffic management, PSCS duties, and compliance with all applicable statutory, safety, technical, and operational requirements.

Please note: No call-off contract will be issued immediately upon award of Lot 3D Instead, once a specific requirement is identified, TII will request a quotation from the contractor and, subject to agreement, will enter into a call-off contract.
The call-off contract will remain in place for the remaining duration of the framework. For example, where a call-off contract is established six months after the framework commencement, the contract duration will extend for the remaining three and a half years. This contract will cover the delivery of the initial scope of works and provide for the instruction of additional work, as required, through task orders over its duration.
This approach ensures that contractors are contractually obliged to deliver works as and when required, while avoiding the need for them to maintain insurances, and associated overheads in advance of any confirmed workload.


LOT-0007
Lot 3E single-supplier framework agreement for Roadside Units (RSU) and On-Board Units (OBU).
The scope includes the supply, installation, testing, integration, commissioning, and handover of ITS equipment, comprising:


• Lot 3E: Roadside Units (RSU) and On-Board Units (OBU)

The Contractor shall deliver the Works at specified locations, coordinate with relevant stakeholders, and ensure full integration with TII systems.
Responsibilities will include traffic management, PSCS duties, and compliance with all applicable statutory, safety, technical, and operational requirements.

Please note: No call-off contract will be issued immediately upon award of Lot 3E Instead, once a specific requirement is identified, TII will request a quotation from the contractor and, subject to agreement, will enter into a call-off contract.
The call-off contract will remain in place for the remaining duration of the framework. For example, where a call-off contract is established six months after the framework commencement, the contract duration will extend for the remaining three and a half years. This contract will cover the delivery of the initial scope of works and provide for the instruction of additional work, as required, through task orders over its duration.
This approach ensures that contractors are contractually obliged to deliver works as and when required, while avoiding the need for them to maintain insurances, and associated overheads in advance of any confirmed workload.


LOT-0008
Lot 3F single-supplier framework agreement for Automatic Number Plate Recognition (ANPR) and Closed-Circuit Television (CCTV) cameras.
The scope includes the supply, installation, testing, integration, commissioning, and handover of ITS equipment, comprising:

• Lot 3F: Automatic Number Plate Recognition (ANPR) and Closed-Circuit Television (CCTV) cameras.

The Contractor shall deliver the Works at specified locations, coordinate with relevant stakeholders, and ensure full integration with TII systems.
Responsibilities will include traffic management, PSCS duties, and compliance with all applicable statutory, safety, technical, and operational requirements.

Please note: No call-off contract will be issued immediately upon award of Lot 3F Instead, once a specific requirement is identified, TII will request a quotation from the contractor and, subject to agreement, will enter into a call-off contract.
The call-off contract will remain in place for the remaining duration of the framework. For example, where a call-off contract is established six months after the framework commencement, the contract duration will extend for the remaining three and a half years. This contract will cover the delivery of the initial scope of works and provide for the instruction of additional work, as required, through task orders over its duration.
This approach ensures that contractors are contractually obliged to deliver works as and when required, while avoiding the need for them to maintain insurances, and associated overheads in advance of any confirmed workload.


LOT-0009
Lot 4 multi-supplier Framework Agreement for ITS equipment (Speed Limit signage).
Lot 4 provides for the supply, installation, integration, and commissioning of Dynamic Warning Signs, thereby establishing a framework agreement through which local authorities may procure speed limit signage, including Periodic School Limit signs, at schools nationwide.
The Contractor shall be responsible for delivery of fully operational systems, including coordination with other contractors and integration with existing TII platforms (e.g. NIMS, ATMS, AFMS). Key obligations include traffic management, PSCS duties, subcontractor management, and compliance with applicable safety, technical, and cybersecurity requirements.
The scope also includes software provision, system integration, remote monitoring capability, and full handover, ensuring all equipment operates effectively within the existing network.

Please Note: Following engagement with the Department of Transport, Lot 4 has been introduced to address a significant and time-critical national requirement arising from the national speed limit review. The Department has issued a ministerial circular requiring local authorities to adopt special speed limit bye-laws for school zones by the end of October 2026 and to implement the associated signage by March 2027. This has resulted in a substantial and urgent demand for Periodic Speed Limit Signs (PSLS).
Lot 4 establishes a framework agreement through which local authorities may procure these works.
TII’s role will be limited to establishing and managing the framework agreement, including overseeing eTenders system and monitoring of framework ceiling values. Local authorities will be responsible for conducting mini-competitions and funding all resulting call-off contracts.
TII does not currently anticipate direct use of Lot 4 but retains the option to utilise the framework should a requirement arise.

The Buyer:
Transport Infrastructure Ireland (TII)
Additional information:
Link:
Additional document: TII492 Lot 3C
Link:
Additional document: TII492 Lot 3D
Link:
Additional document: TII492 Lot 3F
Link:
Download Full Notice as PDF
Link:
View Full Notice
Link:
Additional document: TII492 Lot 3A
Link:
Additional document: TII492 Lot 3B
Link:
Additional document: TII492 Lot 1
Link:
Additional document: TII492 Lot 2
Link:
Additional document: TII492 Lot 4
Link:
Additional document: TII492 Lot 3E
CPV Code(s):
32570000 - Communications equipment
34923000 - Road traffic-control equipment
34924000 - Variable message signs
34970000 - Traffic-monitoring equipment
34996000 - Control, safety or signalling equipment for roads
45233290 - Installation of road signs
45316200 - Installation of signalling equipment
48813100 - Electronic bulletin boards