Installation of four complete air-source heat pump systems and photovoltaic installations along with energy storage for public utility buildings in the Municipality of Porąbka under the 'design and build' formula | Tenderlake

Installation of four complete air-source heat pump systems and photovoltaic installations along with energy storage for public utility buildings in the Municipality of Porąbka under the 'design and build' formula

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
02 January 2025
Closing Date:
21 January 2025
Location(s):
PL225 Bielski (PL Poland/POLSKA)
Description:
The project involves designing and installing air-source heat pump systems, photovoltaic installations, and energy storage for public utility buildings in the Municipality of Porąbka, aimed at reducing pollution through renewable energy sources.

1. The subject of the contract is the design and execution of supplies, construction works, and installations as part of the investment 'Installation of four complete air-source heat pump systems and photovoltaic installations together with energy storage for public utility buildings in the Municipality of Porąbka'. 2. The investment is carried out under the project titled 'We draw energy from nature - reducing pollution through the use of renewable energy sources in the Municipality of Porąbka', co-financed by the European Regional Development Fund and the state budget. 3. The planned investment task is intended to be implemented under the 'design and build' formula mentioned in Article 103 of the Act of September 11, 2019, Public Procurement Law (i.e., Dz.U. 2024, item 1320). The subject of the contract is described using the Functional and Utility Program (PFU), which forms one of the technical attachments describing the subject of the contract. 4. The scope of the public contract includes: 1) development of complete design documentation (design stage) along with obtaining necessary opinions, permits, etc., and performing author's supervision, 2) execution of construction works, including installation, its commissioning, and obtaining the required formal-legal documentation in accordance with applicable regulations allowing for the operation of renewable energy installations for the following public utility buildings: a) Primary School No. 1 in Porąbka - photovoltaic installation with a minimum capacity of 34.96 kWp, - energy storage with a minimum capacity of 80 kWh, - air-source heat pump for hot water production with a minimum capacity of 12 kW. - energy management system with weather station (integration of three technologies) b) Primary School in Bujaków - photovoltaic installation with a minimum capacity of 24.84 kWp, - two air-source heat pumps with a minimum capacity of 24 kW each. - energy management system (integration of two technologies) c) Public Nursery No. 2 in Czańcu - photovoltaic installation with a minimum capacity of 7.36 kWp, - air-source heat pump with a minimum capacity of 18 kW. - energy management system (integration of two technologies) d) Public Nursery in Kobiernice - photovoltaic installation with a minimum capacity of 41.86 kWp, - two air-source heat pumps with a minimum capacity of 18 kW each. - energy management system (integration of two technologies) 5. The detailed scope of the subject of the contract is presented in the Functional and Utility Program (PFU) – Appendix No. 1 to the OPZ and in the remaining technical documents pertaining to the description of the subject of the contract consisting of SWZ No. ZP.271.1.25.2024.


LOT-0001
ZP.271.1.25.2024
Installation of four complete air-source heat pump systems and photovoltaic installations along with energy storage for public utility buildings in the Municipality of Porąbka under the 'design and build' formula.
1. The subject of the contract is the design and execution of supplies, construction works, and installations as part of the investment 'Installation of four complete air-source heat pump systems and photovoltaic installations together with energy storage for public utility buildings in the Municipality of Porąbka'. 2. The investment is carried out under the project titled 'We draw energy from nature - reducing pollution through the use of renewable energy sources in the Municipality of Porąbka', co-financed by the European Regional Development Fund and the state budget. 3. The planned investment task is intended to be implemented under the 'design and build' formula mentioned in Article 103 of the Act of September 11, 2019, Public Procurement Law (i.e., Dz.U. 2024, item 1320). The subject of the contract is described using the Functional and Utility Program (PFU), which forms one of the technical attachments describing the subject of the contract. 4. The scope of the public contract includes: 1) development of complete design documentation (design stage) along with obtaining necessary opinions, permits, etc., and performing author's supervision, 2) execution of construction works, including installation, its commissioning, and obtaining the required formal-legal documentation in accordance with applicable regulations allowing for the operation of renewable energy installations for the following public utility buildings: a) Primary School No. 1 in Porąbka - photovoltaic installation with a minimum capacity of 34.96 kWp, - energy storage with a minimum capacity of 80 kWh, - air-source heat pump for hot water production with a minimum capacity of 12 kW. - energy management system with weather station (integration of three technologies) b) Primary School in Bujaków - photovoltaic installation with a minimum capacity of 24.84 kWp, - two air-source heat pumps with a minimum capacity of 24 kW each. - energy management system (integration of two technologies) c) Public Nursery No. 2 in Czańcu - photovoltaic installation with a minimum capacity of 7.36 kWp, - air-source heat pump with a minimum capacity of 18 kW. - energy management system (integration of two technologies) d) Public Nursery in Kobiernice - photovoltaic installation with a minimum capacity of 41.86 kWp, - two air-source heat pumps with a minimum capacity of 18 kW each. - energy management system (integration of two technologies) 5. The detailed scope of the subject of the contract is presented in the Functional and Utility Program (PFU) – Appendix No. 1 to the OPZ and in the remaining technical documents pertaining to the description of the subject of the contract consisting of SWZ No. ZP.271.1.25.2024.

The Buyer:
Gmina Porąbka
Additional information:
Link:
View Full Notice
Link:
Download Full Notice as PDF
Link:
Additional document: SWZ nr ZP.271.1.25.2024
CPV Code(s):
09331200 - Solar photovoltaic modules
09332000 - Solar installation
31430000 - Electric accumulators
42122460 - Air pumps
42511110 - Heat pumps
45220000 - Engineering works and construction works
45310000 - Electrical installation work
45320000 - Insulation work
45331000 - Heating, ventilation and air-conditioning installation work
51112200 - Installation services of electricity control equipment
71200000 - Architectural and related services
71320000 - Engineering design services