Complex Development of the Northern District - Planning | Tenderlake

Complex Development of the Northern District - Planning

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
11 November 2026
Closing Date:
03 December 2026
Location(s):
HU333 Csongrád (HU Hungary/MAGYARORSZÁG)
Description:
Preparation of licensing and execution plans, designer supervision, and ancillary services are required for the complex reconstruction of the Northern District, focusing on green area development, recreational spaces, pedestrian and bicycle paths, public lighting modernization, and related infrastructure improvements.

In connection with the project titled "Complex Reconstruction of the Northern District," preparation of licensing and execution plans, designer supervision, and related ancillary services are to be provided.


LOT-0001
EKR001483172026/1
Complex development of the Northern District - planning.
Within the framework of the design contract related to the project titled "Complex Reconstruction of the Northern District," preparation of licensing and execution plans, designer supervision, and related ancillary services will be carried out. The subject of the design: Within the project, reconstruction of green areas (tree planting, shrub planting), development of recreational green spaces (playground renovation, pump track construction), development of pedestrian and bicycle paths, protection of green areas, renovation of road and parking surfaces to the extent necessary to prioritize pedestrian and bicycle traffic, modernization of public lighting, and installation of bicycle racks will be realized. Area affected by the design: The design concerns the area bounded by József Attila Boulevard – Makkosházi Boulevard – Rókusi Boulevard – Körtöltés Street – Makkoserdő Road – Rózsa Street, according to the attached overview site plan. The licensing and execution plans must be prepared according to the following territorial divisions: Western side of Csongrádi Boulevard: Area 1: "Small forest" between Margaréta Street and Csongrádi Blvd. Area 2: Block interior enclosed by Margaréta Street – Sárosi Street – Csongrádi Blvd, playground and surroundings Area 3: Block interior enclosed by Margaréta Street – Sárosi Street – Csongrádi Blvd, dog park and surroundings Area 4: Junction of Csongrádi Blvd service road Area 5: Sárosi Street – Kodály Square parking (parking affecting buildings with plot numbers 11643/31 and 11643/30 on their southern side) Area 6: Area in front of Kossuth Zsuzsanna Technical School and Secondary School Area 7: Area next to Kossuth Zsuzsanna Technical School and Secondary School Area 8: Cső Street – Ács Street community garden Area 9: Intersection of Cső Street – Ács Street and surrounding Area Eastern side of Csongrádi Boulevard: Area 10: Csongrádi Blvd – (plot no. 15786/49, former circus area) Area 11: Area next to Makkosházi Blvd, Dunakor shopping center Area 12: Block interior of Gáz Street - Csongrádi Blvd - Ág Street Area 13: Block interior of Agyagos Street – Gáz Street Area 14: Corner of Ág Street - area in front of Pelikán Pharmacy Area 15: Expansion of the playground behind Pelikán Pharmacy and surrounding development Area 16: Bimbó Street parking Area 17: Environment of Odú Center, Pedagogical Specialist Service Institution, Gáspár Zoltán Street medical clinics, Szeged OVI Gedói kindergarten Area 18: Parking and green strip in front of residential buildings at Agyagos Street 4 - 8 Area 19: Development at the Northern District I/B heating plant, area next to Dugonics Cemetery Area 20: Green area and playground development on the Dugonics Cemetery – Csongrádi Blvd side Area 21: Development of other areas on the eastern side of Csongrádi Blvd in the Northern District. Detailed task descriptions for the areas are contained in the document titled "Detailed Task Specification ESZAKI VAROSRESZ." The expected technical content of the plans includes: -Geodetic surveys are available, their review is the responsibility of the Designer. -In planning road repairs and parking constructions, existing and planned traffic engineering elements must be indicated and, if necessary, approved. -Drainage of the designed facilities must be ensured in harmony with the existing drainage on adjoining surfaces. -To retain rainwater locally, rainwater collected from surrounding pavements and roofs must be directed to and stored on green areas. -LED luminaires must be designed for public lighting within the design area. -As part of the horticultural/landscape architectural plan, a list of trees to be cut must be prepared, indicating species and quantities. Planting plans should specify species and quantities of plants and prepare a planting plan; number and locations of playground elements and street furniture must be determined. Locations and layouts of community gardens must be defined. Tree cutting permits must be obtained. Tree cutting and replacement documentation must be compiled. -During design, compliance with MSZ 12042:2019 (Tree protection on construction sites) and MSZ 12172:2019 (Planting of ornamental trees and shrubs in public areas of settlements) standards is required to protect existing or planned trees on the construction site. -Planting of newly planted trees must be designed according to the applicable standards and maintenance instructions. -During utility coordination, special attention must be given to utility protection conditions related to planned trees, and these conditions must be incorporated accordingly. -An examination of the cost-effective installation of automatic irrigation systems must be made and, if necessary, designed. -Manhole and drain covers located along new facility routes within the design area must be levelled and reconstructed as needed. Pavement coverings of required covers must match or harmonize with the pavements of new facilities. -The Designer is responsible for coordinating all specialty designs. Further tasks include examining utilities and consulting with providers (examining necessary relocations, obtaining approvals). A utility general plan must be prepared based on obtained utility data. If there is no utility provider intent for utility development or reconstruction, this must be documented in writing with the providers. -Designing necessary utility relocations and protections, cooperating with utility designers. -The Designer is responsible for complex, barrier-free design of special playground elements and their surroundings. Due to character limits, continuation is provided under Further Information.

The Buyer:
Szeged Megyei Jogú Város Önkormányzata
Additional information:
Link:
View Full Notice
Link:
Additional document: DOC-01
Link:
Download Full Notice as PDF
CPV Code(s):
71240000 - Architectural, engineering and planning services
71320000 - Engineering design services
71322000 - Engineering design services for the construction of civil engineering works