Expansion and modernization of the sewage treatment plant in Bytkowo, Rokietnica | Tenderlake

Expansion and modernization of the sewage treatment plant in Bytkowo, Rokietnica

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
31 March 2026
Closing Date:
05 May 2026
Location(s):
PL418 Poznański (PL Poland/POLSKA)
Description:
The project involves expanding and modernizing the sewage treatment plant in Bytkowo, Rokietnica, including new facilities and infrastructure to increase capacity and improve wastewater treatment efficiency.

The subject of the contract is the expansion of the existing sewage treatment plant in Bytkowo, Rokietnica, which includes the construction of new sewage treatment plant facilities along with the necessary technical infrastructure, as well as the modernization and expansion of the existing and functioning sewage treatment plant facilities to cooperate with the new structures. The scope of the contract includes full commissioning and startup of the treatment plant, along with the preparation of an application with an operation enabling the Ordering Party to obtain a new water legal permit and an application for use permit. The full content is provided in the SWZ in Section 4.


LOT-0001
ZP.271.04.2026
“Expansion and modernization of the sewage treatment plant in Bytkowo, Rokietnica.”
4.1. The subject of the contract is the expansion of the existing sewage treatment plant in Bytkowo, Rokietnica, which includes the construction of new sewage treatment plant facilities along with the necessary technical infrastructure, as well as the modernization and expansion of the existing and functioning sewage treatment plant facilities to cooperate with the new structures. The scope of the contract includes full commissioning and startup of the treatment plant, along with the preparation of an application with an operation enabling the Ordering Party to obtain a new water legal permit and an application for use permit. 4.2. The primary assumption of the expansion of the existing sewage treatment plant in Bytkowo is to increase its capacity and ensure an appropriate level of treatment of wastewater coming to the treatment plant via the sewage system from the Rokietnica municipality and transported by vacuum trucks. The existing installation is hydraulically overloaded, functioning at maximum RLM loads, which causes the exceeding of minimum permissible contamination parameters in the treated wastewater due to the continuous increase in residents and the rapid economic development of the Rokietnica agglomeration. 4.3. The expansion of the treatment plant in Bytkowo has been designed based on the same sewage treatment technology currently operating at the existing facility, involving mechanical-biological treatment of wastewater using reactors based on low-loaded aerobic stabilized activated sludge technology, along with the simultaneous removal of biogenic compounds (nitrogen and phosphorus) by biological methods in a continuous flow system due to its high efficiency so far. The planned capacity of the treatment plant will be: Qśrd. = 5,000 [m3/d], and the load: 42,891 RLM. Information about the subject of the contract is included in Section 4 of the SWZ and its attachments.

The Buyer:
Przedsiębiorstwo Usług Komunalnych Sp. z o.o.
Additional information:
Link:
Additional document: ZP.271.04.2026
Link:
Download Full Notice as PDF
Link:
View Full Notice
CPV Code(s):
31174000 - Power supply transformers
42122220 - Sewage pumps
44611420 - Sludge-storage tanks
45000000 - Construction work
45100000 - Site preparation work
45110000 - Building demolition and wrecking work and earthmoving work
45111291 - Site-development work
45200000 - Works for complete or part construction and civil engineering work
45210000 - Building construction work
45213250 - Construction work for industrial buildings
45220000 - Engineering works and construction works
45222110 - Waste disposal site construction work
45223800 - Assembly and erection of prefabricated structures
45231300 - Construction work for water and sewage pipelines
45232410 - Sewerage work
45232423 - Sewage pumping stations construction work
45240000 - Construction work for water projects
45252100 - Sewage-treatment plant construction work
45252127 - Wastewater treatment plant construction work
45252200 - Purification plant equipment
45261000 - Erection and related works of roof frames and coverings
45262520 - Bricklaying work
45300000 - Building installation work
45310000 - Electrical installation work
45311000 - Electrical wiring and fitting work
45314000 - Installation of telecommunications equipment
45320000 - Insulation work
45330000 - Plumbing and sanitary works
45331000 - Heating, ventilation and air-conditioning installation work
45332000 - Plumbing and drain-laying work
45400000 - Building completion work
45443000 - Facade work
71355000 - Surveying services