It is planned to supply the RoRo and ConRo ships calling at the UNIKAI Terminal with shore power, so that the ships' own diesel generators can be switched off during the berthing time at the quay, thereby reducing local pollutant emissions. For this purpose, two berths at the UNIKAI Terminal are to be equipped with shore power supply systems. The converter station will be built on the premises of the UNIKAI Terminal. For the handover of the supply cables to the ships, two mobile Cable Management Systems (CMS) will be installed. For the grid connection and the entire cabling of the shore power system, a duct and shaft system will be installed at the UNIKAI Terminal.
The overall project is divided into several tender units. The subject of this invitation to tender is the construction of a duct route with shafts. A detailed description of the requirements can be found in the following chapters.
1. Construction of the cable route between the Unikai power center and the converter station.
2. Construction of the cable route between the converter station and the CMS, including ducts and shafts to allow for future connections for container ships.
3. Preparation of the execution planning for the shafts, as well as manufacturing, delivery, and installation of the shafts.
LOT-0000
0
Construction of cable routes for the Unikai shore power system.
It is planned to supply the RoRo and ConRo ships calling at the UNIKAI Terminal with shore power, so that the ships' own diesel generators can be switched off during the berthing time at the quay, thereby reducing local pollutant emissions. For this purpose, two berths at the UNIKAI Terminal are to be equipped with shore power supply systems. The converter station will be built on the premises of the UNIKAI Terminal. For the handover of the supply cables to the ships, two mobile Cable Management Systems (CMS) will be installed. For the grid connection and the entire cabling of the shore power system, a duct and shaft system will be installed at the UNIKAI Terminal.
The overall project is divided into several tender units. The subject of this invitation to tender is the construction of a duct route with shafts. A detailed description of the requirements can be found in the following chapters.
1. Construction of the cable route between the Unikai power center and the converter station.
2. Construction of the cable route between the converter station and the CMS, including ducts and shafts to allow for future connections for container ships.
3. Preparation of the execution planning for the shafts, as well as manufacturing, delivery, and installation of the shafts.