In the UW Robiei, a renewal of the GIS system including secondary technology and auxiliary installations is planned. A complete replacement of the GIS system is scheduled. For the development of the construction project and support during the approval phase, as well as optionally for later phases, engineering services in the field of substation planning are needed.
In this contract, the necessary planning services for the Swissgrid Phase 32 are provided to complete the construction project phase. Furthermore, the PGV documents for the subsequent Phase 33 must be prepared. The services for the additional phases 41, 51, 52, and 53 will be offered optionally. The scope of services includes:
Design of a new gas-insulated switchgear (GIS), a transition structure, the 220 kV cable connections, the field control technology (FLT), secondary technology (SAS), and internal service installations. Detailed information regarding the scope of services can be found in the specifications and other tender documents.
In the substation of Robiei, a renewal of the GIS system, which includes secondary technology and auxiliary installations, is planned. A complete replacement of the GIS system is scheduled. For the preparation of the construction project and the support of the approval phase, as well as optionally for the later phases, engineering services in the field of planning substations are necessary.
This contract provides the necessary planning services for the Swissgrid Phase 32 to successfully complete the construction project phase. Additionally, the PAP documents must be prepared for the next phase 33. Services for the subsequent phases 41, 51, 52, and 53 will be offered optionally. The scope of services includes:
Design of a new gas-insulated switching station (GIS), a transition structure, 220 kV cable connections, a field control system (FLT), secondary technology (SAS), and internal services. Detailed information regarding the scope of services is available in the specifications and other contractual documents.
In the Robiei substation, a renewal of the GIS system is planned, including secondary technology and auxiliary structures. A complete replacement of the GIS system is expected. For preparing the construction project and supporting the approval phase, as well as optionally for subsequent phases, engineering services in the field of substation planning are required.
This mandate provides the necessary design services for Swissgrid Phase 32 in order to complete the construction project phase. Additionally, PAP documents for the subsequent Phase 33 must be prepared. Services for the additional phases 41, 51, 52, and 53 will be offered optionally. The scope of services includes:
Design of a new gas-insulated switching station (GIS), a transition structure, the 220 kV cable connections, the field control system (FLT), secondary technology (SAS), and internal services. Detailed information on the scope of services is available in the specifications and in other procurement documents.
LOT-0000
S085 UW Robiei 220 kV, New Construction Project - General Planner Phases 32-53.
In the UW Robiei, a renewal of the GIS system including secondary technology and auxiliary installations is planned. A complete replacement of the GIS system is scheduled. For the development of the construction project and support during the approval phase, as well as optionally for later phases, engineering services in the field of substation planning are needed.
In this contract, the necessary planning services for the Swissgrid Phase 32 are provided to complete the construction project phase. Furthermore, the PGV documents for the subsequent Phase 33 must be prepared. The services for the additional phases 41, 51, 52, and 53 will be offered optionally. The scope of services includes:
Design of a new gas-insulated switchgear (GIS), a transition structure, the 220 kV cable connections, the field control technology (FLT), secondary technology (SAS), and internal service installations. Detailed information regarding the scope of services can be found in the specifications and other tender documents.