Electrical Engineering
Key Data:
- PV system approx. 40 kWp
- Main distribution approx. 2 cabinets
- Circuit sub-distributors approx. 4 cabinets
- Cable trays approx. 300 m
- Cables/wires approx. 28,000 m
- Lights approx. 320 pcs.
- Central battery SiBe 1 pcs.
- Clock system approx. 7 pcs.
- Public address system 1 pcs.
- Fire alarm system 1 pcs.
- Data technology 1 data distributor.
LOT-0000
Electrical Engineering.
- PV system approx. 40 kWp
- Main distribution approx. 2 cabinets
- Circuit sub-distributors approx. 4 cabinets
- Cable trays approx. 300 m
- Cables/wires approx. 28,000 m
- Lights approx. 320 pcs.
- Central battery SiBe 1 pcs.
- Clock system approx. 7 pcs.
- Public address system 1 pcs.
- Fire alarm system 1 pcs.
- Data technology 1 data distributor