Delivery and Installation of Electrical Energy Storage Systems for Municipal Infrastructure Facilities of the Mińsk Mazowiecki Municipality | Tenderlake

Delivery and Installation of Electrical Energy Storage Systems for Municipal Infrastructure Facilities of the Mińsk Mazowiecki Municipality

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
13 October 2026
Closing Date:
16 November 2026
Location(s):
PL912 Warszawski wschodni (PL Poland/POLSKA)
Assessment:
This notice contains 1 positive AI Assessment(s) of your products/services' relevance for this procurements.  
Sign in to Tenderlake with your Pro or Primary account to read the assessments.
Description:
The contract involves designing, delivering, and installing nine electrical energy storage systems integrated with existing or planned photovoltaic installations at various municipal facilities, along with providing operation manuals, warranty service, and training for staff.

The subject of the contract is the design, delivery, installation, commissioning, and integration of nine electrical energy storage systems with electrical power installations and existing or planned photovoltaic installations associated with municipal infrastructure facilities of the Mińsk Mazowiecki Municipality - 3 primary schools, 3 water treatment stations, and 3 pumping stations.
The scope of the contract also includes the preparation of the operation manual for the installation in the Polish language, warranty service, and conducting training for persons indicated by the Contracting Authority regarding the principles of operation, use, maintenance, and safety in relation to the use of the installed system.
The order covers the following facilities:
- Primary School named after Ks. Antoni Tyszka in Janów,
- Primary School named after Maria Konopnicka in Brzóze,
- Primary School named after Karol Wojtyła in Huta Mińska with seat in Cielechowizna,
- Królewiec Water Treatment Station,
- Janów Water Treatment Station,
- Zamienie Water Treatment Station,
- Brzóze Pumping Station,
- Cielechowizna Pumping Station,
- Janów Pumping Station,
where 2 facilities: Brzóze Pumping Station and Cielechowizna Pumping Station are not connected to an existing photovoltaic installation, however, the Contracting Authority possesses project documentation for their execution.
The Contractor will provide servicing for the installed system throughout the warranty and liability period, with the Contracting Authority requiring a 10-year manufacturer’s warranty for the battery system (AC charger and control unit) and 5 years manufacturer’s warranty for the other installed components/materials.
Details regarding the requirements for the preparation of project documentation and the description of assembly and installation works are specified in the Terms of Reference (PFU), constituting Annex No. 1 to the Terms of Contract (SWZ) – Documentation - PFU.


LOT-0001
Delivery and installation of electrical energy storage systems for municipal infrastructure facilities of the Mińsk Mazowiecki Municipality.
The subject of the contract is the design, delivery, installation, commissioning, and integration of nine electrical energy storage systems with electrical power installations and existing or planned photovoltaic installations associated with municipal infrastructure facilities of the Mińsk Mazowiecki Municipality - 3 primary schools, 3 water treatment stations, and 3 pumping stations.
The scope of the contract also includes the preparation of the operation manual for the installation in the Polish language, warranty service, and conducting training for persons indicated by the Contracting Authority regarding the principles of operation, use, maintenance, and safety in relation to the use of the installed system.
The order covers the following facilities:
- Primary School named after Ks. Antoni Tyszka in Janów,
- Primary School named after Maria Konopnicka in Brzóze,
- Primary School named after Karol Wojtyła in Huta Mińska with seat in Cielechowizna,
- Królewiec Water Treatment Station,
- Janów Water Treatment Station,
- Zamienie Water Treatment Station,
- Brzóze Pumping Station,
- Cielechowizna Pumping Station,
- Janów Pumping Station,
where 2 facilities: Brzóze Pumping Station and Cielechowizna Pumping Station are not connected to an existing photovoltaic installation, however, the Contracting Authority possesses project documentation for their execution.
The Contractor will provide servicing for the installed system throughout the warranty and liability period, with the Contracting Authority requiring a 10-year manufacturer’s warranty for the battery system (AC charger and control unit) and 5 years manufacturer’s warranty for the other installed components/materials.
Details regarding the requirements for the preparation of project documentation and the description of assembly and installation works are specified in the Terms of Reference (PFU), constituting Annex No. 1 to the Terms of Contract (SWZ) – Documentation - PFU.

The Buyer:
Gmina Mińsk Mazowiecki
Additional information:
Link:
Download Full Notice as PDF
Link:
View Full Notice
Link:
Additional document: generated_id
CPV Code(s):
31121110 - Power converters
31400000 - Accumulators, primary cells and primary batteries
45000000 - Construction work
45231000 - Construction work for pipelines, communication and power lines
45232000 - Ancillary works for pipelines and cables
45232200 - Ancillary works for electricity power lines
45310000 - Electrical installation work
51112000 - Installation services of electricity distribution and control equipment
71314100 - Electrical services
71320000 - Engineering design services
71323100 - Electrical power systems design services
71326000 - Ancillary building services