The subject of the public procurement is the design, supply, installation, commissioning, and maintenance of battery storages in the HSE group. The order includes the preparation and submission of all necessary project documentation (PZI, PID, DZO) and includes all activities necessary for the successful acquisition of a building permit. The battery storages will be installed outdoors at various locations near the existing electric energy facilities of the HSE group.
The mentioned projects represent framework projects, and the contracting authority is not obliged to award all projects. Actual orders for projects will depend on the actual needs of the contracting authority.
A detailed specification of the order (minimum technical requirements) is included in the list of technical data - the technical part of the documentation related to the public procurement (hereinafter referred to as: technical part/closed part), which interested bidders can obtain according to the rules of the documentation related to the public procurement.
The retrieval of the closed part of the documentation related to the public procurement is a condition for submitting an offer.
The contracting authority aims to:
- procure offers based on which it will conclude a framework agreement for a period of forty (40) months or until the maximum estimated contractual value under the framework agreement is exhausted, with the right to extend the validity period of the framework agreement if the maximum estimated value is not exhausted/achieved within forty (40) months, with a maximum of three (3) bidders, whose offers will be permissible and based on the selection criterion the most favorable;
- select a supplier for the supply of goods for the first individual order from the most favorable final permissible offer from the procedure with negotiations with publication among the suppliers with whom the framework agreement has been concluded.
The rules regarding the submission method of the public procurement are described in detail in the section Submission Method of Public Procurement in the documentation related to the public procurement.
LOT-0000
Construction of Battery Systems in the HSE Group.
The subject of the public procurement is the design, supply, installation, commissioning, and maintenance of battery storages in the HSE group. The order includes the preparation and submission of all necessary project documentation (PZI, PID, DZO) and includes all activities necessary for the successful acquisition of a building permit. The battery storages will be installed outdoors at various locations near the existing electric energy facilities of the HSE group.
The mentioned projects represent framework projects, and the contracting authority is not obliged to award all projects. Actual orders for projects will depend on the actual needs of the contracting authority.
A detailed specification of the order (minimum technical requirements) is included in the list of technical data - the technical part of the documentation related to the public procurement (hereinafter referred to as: technical part/closed part), which interested bidders can obtain according to the rules of the documentation related to the public procurement.
The retrieval of the closed part of the documentation related to the public procurement is a condition for submitting an offer.
The contracting authority aims to:
- procure offers based on which it will conclude a framework agreement for a period of forty (40) months or until the maximum estimated contractual value under the framework agreement is exhausted, with the right to extend the validity period of the framework agreement if the maximum estimated value is not exhausted/achieved within forty (40) months, with a maximum of three (3) bidders, whose offers will be permissible and based on the selection criterion the most favorable;
- select a supplier for the supply of goods for the first individual order from the most favorable final permissible offer from the procedure with negotiations with publication among the suppliers with whom the framework agreement has been concluded.
The rules regarding the submission method of the public procurement are described in detail in the section Submission Method of Public Procurement in the documentation related to the public procurement.