Planning and Construction of Charging Infrastructure Including Transformer for Charging Regional Buses | Tenderlake

Planning and Construction of Charging Infrastructure Including Transformer for Charging Regional Buses

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
23 January 2026
Closing Date:
11 February 2026
Location(s):
DEG06 Eichsfeld (DE Germany/DEUTSCHLAND)
Description:
EW Bus GmbH seeks to plan and construct a scalable charging infrastructure, including transformer technology, to support the transition of its regional bus fleet to battery-electric drives.

Public transport (ÖPNV) plays a central role in the sustainable mobility transition. To reduce environmental impacts and CO2 emissions, the introduction of low-emission and climate-friendly bus drives is being advanced. Battery-electric buses offer a promising alternative to conventional diesel buses. They are locally emissions-free, thus contributing to the improvement of air quality in cities and communities. Furthermore, they are significantly quieter than diesel buses, leading to reduced noise pollution.
Additionally, public transport companies are required by the 'Clean Vehicle Directive' (CVD) at the EU level and the 'Clean Vehicles Procurement Act' (SaubFahrzeugBe-schG), which has been in effect in Germany since June 2021, to adhere to binding minimum targets for the procurement of vehicles with alternative drives for the first time. This is particularly relevant for the procurement of buses for public transport.
This transition requires that with the introduction of battery-electric buses in public transport at EW Bus GmbH in Eichsfeld, a subsidiary of Eichsfeldwerke, an appropriate, optimized charging infrastructure is provided. The aim of the tender is to create an efficient and scalable charging infrastructure with coordinated transformer technology.
An efficient public transport system can only function with high-quality, tailored charging infrastructure. For this reason, EW Bus GmbH - referred to as the contracting authority - is issuing a tender for a scalable and standardized charging solution.


LOT-0001
LOT-0001 EW-Bus_LIS25
Planning and Construction of Charging Infrastructure -LIS - including transformer for charging regional buses.
EW Bus GmbH - referred to as the contracting authority - plans to gradually transition the regional bus fleet to emissions-free drive technologies starting in 2026. In this context, EW Bus GmbH is tendering for the planning and construction of a charging infrastructure (LIS) including central energy storage with charging points for depot charging of 4 standard line buses for regional traffic with battery-electric drive (1st step).
The completion and acceptance of the facility must be finalized by December 11, 2026.
This contract includes, in addition to the technical facilities of the LIS, the training of personnel from EW Bus GmbH as well as the maintenance and repair of the entire facility (from acceptance for a term until the contractually agreed expiration of the statute of limitations for warranty claims).
The performance obligations to be fulfilled by the contractor can be found in the price sheet as well as the performance description with all annexes. Bids must be submitted based on the mentioned documents.

The Buyer:
EW Bus GmbH
Additional information:
Link:
Download Full Notice as PDF
Link:
Additional document: E18513521
Link:
View Full Notice
CPV Code(s):
31682000 - Electricity supplies