Construction of charging infrastructure on the premises of SWU. The charging infrastructure is to be installed on an open area with a partially bound surface and supply 20 vehicles. 2 pantograph chargers will be installed to charge the newly procured electric buses of SWU. These are to provide a power of 300 kW in continuous operation, with a simultaneity of 0.5. Additionally, 18 plug chargers CCS type 2 will be installed. These are to provide a power of 60 kW in continuous operation at a simultaneity of 1. At a lower simultaneity, a peak power of 150 kW should be possible. On the property, 2MW is available on the medium voltage side.
LOT-0001
LOT-0001 SWU-VLI
SWU-VLI | Traffic Charging Infrastructure.
Construction of charging infrastructure on the premises of SWU. The charging infrastructure is to be installed on an open area with a partially bound surface and supply 20 vehicles. 2 pantograph chargers will be installed to charge the newly procured electric buses of SWU. These are to provide a power of 300 kW in continuous operation, with a simultaneity of 0.5. Additionally, 18 plug chargers CCS type 2 will be installed. These are to provide a power of 60 kW in continuous operation at a simultaneity of 1. At a lower simultaneity, a peak power of 150 kW should be possible. On the property, 2MW is available on the medium voltage side.