The subject of the contract is the design, delivery, installation, and commissioning of energy storage systems for existing RES installations for 8 public utility buildings and 162 private buildings belonging to the residents of Ciechanów. An increase in the number of energy storage units is allowed to achieve the required storage capacity of 1606.80 kWh. The project will be implemented in a 'design and build' format under funding from the European Funds for Mazovia 2021-2027, Priority II European Funds for Green Development of Mazovia, Action 2.3 Renewable Energy Sources, Project type: Energy and Heat Storage. The energy storage systems shall be equipped with an energy management system (hardware and software) that will be responsible for: monitoring and controlling electricity consumption in the facility, managing this energy, managing and optimizing the energy consumption profile, maximizing self-consumption while considering the final price optimization of electricity. Due to the provisions applied in this procedure as mentioned in Art. 139 par. 2 of the Public Procurement Law, contractors are not required to submit with their offer a statement of non-exclusion or meeting the conditions for participation in the procedure on the unified European document form (JEDZ), as the Contracting Authority foresees the possibility of requiring this statement only from the contractor whose offer has been rated the highest. This procedure is conducted in accordance with the provisions of the Act of September 11, 2019 - Public Procurement Law (Journal of Laws of 2024, item 1320, as amended), in an unrestricted tender procedure (Art. 132 of the Public Procurement Law).
LOT-0001
WZP.271.1.37.2025
Electricity Storage for Single-Family Residential Buildings and Public Utility Buildings in Ciechanów.
The subject of the contract is the design, delivery, installation, and commissioning of energy storage systems for existing RES installations for 8 public utility buildings and 162 private buildings belonging to the residents of Ciechanów. An increase in the number of energy storage units is allowed to achieve the required storage capacity of 1606.80 kWh. The project will be implemented in a 'design and build' format under funding from the European Funds for Mazovia 2021-2027, Priority II European Funds for Green Development of Mazovia, Action 2.3 Renewable Energy Sources, Project type: Energy and Heat Storage. The energy storage systems shall be equipped with an energy management system (hardware and software) that will be responsible for: monitoring and controlling electricity consumption in the facility, managing this energy, managing and optimizing the energy consumption profile, maximizing self-consumption while considering the final price optimization of electricity. Due to the provisions applied in this procedure as mentioned in Art. 139 par. 2 of the Public Procurement Law, contractors are not required to submit with their offer a statement of non-exclusion or meeting the conditions for participation in the procedure on the unified European document form (JEDZ), as the Contracting Authority foresees the possibility of requiring this statement only from the contractor whose offer has been rated the highest. This procedure is conducted in accordance with the provisions of the Act of September 11, 2019 - Public Procurement Law (Journal of Laws of 2024, item 1320, as amended), in an unrestricted tender procedure (Art. 132 of the Public Procurement Law).