PV Installations/Energy Storage for Buildings Owned by the Municipality of Dobromierz as Part of the Municipal Renewable Energy Partnership Programs for the Świdnica County (PPEK) | Tenderlake

PV Installations/Energy Storage for Buildings Owned by the Municipality of Dobromierz as Part of the Municipal Renewable Energy Partnership Programs for the Świdnica County (PPEK)

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
28 April 2026
Closing Date:
29 May 2026
Location(s):
PL517 Wałbrzyski (PL Poland/POLSKA)
Description:
Design, delivery, and installation of hybrid microphotovoltaic systems with energy storage and management systems for various municipal public utility facilities in Dobromierz.

The subject of the contract is the design, delivery, and installation of hybrid microphotovoltaic installations along with energy storage, a backup power supply system, and a management system integrating these generation systems with the Polish energy market, intended for operation in municipal public utility facilities:

1) Wastewater treatment plant in Czernica
rated power of PV system 16.38 kWp, energy storage 30 kWh
2) Orlik in Roztoce, ul. Sportowa 2
rated power of PV system 10.01 kWp, energy storage 15 kWh
3) OSP Roztoka, ul. 3 Maja 53,
rated power of PV system 6.37 kWp, energy storage 10 kWh
4) Primary School in Dobromierz, ul. Podgórna 2,
rated power of PV system 12.285 kWp, energy storage 20 kWh
5) Primary School in Gniewkowo, Gniewków 3,
energy storage 10 kWh
6) Primary School in Roztoce, ul. Jana Pawła II 9,
energy storage 20 kWh
7) Village hall in Czernica, Czernica 8,
rated power of PV system 10.01 kWp, energy storage 20 kWh
8) Village hall in Kłaczynie, Kłaczyna 94A
rated power of PV system 10.01 kWp, energy storage 30 kWh
9) Village hall in Roztoce, ul. 3 Maja 61
rated power of PV system 10.01 kWp, energy storage 20 kWh

1. The order includes, in particular:
– the development of the required technical documentation in accordance with legal regulations and meeting the requirements specified in these requirements,
– obtaining all required legal approvals, opinions, and submissions, especially in terms of fire safety and structural safety,
– delivery of devices and materials,
– assembly, commissioning, configuration, and handing over the installation for use,
– preparation of acceptance documentation containing, in particular, technical cards, technical approvals, certificates of devices and materials used for the construction of the installation, acceptance and measurement protocols, and as-built diagrams,
– preparation of operation manuals and training for installation users.
2. The contracting authority requires that:
– the rated power of the installed photovoltaic systems is not less than the required power for each location,
– the capacity of the energy storage is not less than the required capacity for each location.

The detailed scope and method of execution of the order are specified in Annex 1 to the SWZ “Subject requirements for hybrid systems” and the documentation contained in the file “Location descriptions”.


LOT-0001
PV Installations/Energy Storage for Buildings Owned by the Municipality of Dobromierz as Part of the Municipal Renewable Energy Partnership Programs for the Świdnica County (PPEK).
Design, delivery, and installation of hybrid microphotovoltaic installations along with energy storage, backup power supply system, and management system integrating these generation systems with the Polish energy market, intended for operation in municipal public utility facilities:

1) Wastewater treatment plant in Czernica
rated power of PV system 16.38 kWp, energy storage 30 kWh
2) Orlik in Roztoce, ul. Sportowa 2
rated power of PV system 10.01 kWp, energy storage 15 kWh
3) OSP Roztoka, ul. 3 Maja 53,
rated power of PV system 6.37 kWp, energy storage 10 kWh
4) Primary School in Dobromierz, ul. Podgórna 2,
rated power of PV system 12.285 kWp, energy storage 20 kWh
5) Primary School in Gniewkowo, Gniewków 3,
energy storage 10 kWh
6) Primary School in Roztoce, ul. Jana Pawła II 9,
energy storage 20 kWh
7) Village hall in Czernica, Czernica 8,
rated power of PV system 10.01 kWp, energy storage 20 kWh
8) Village hall in Kłaczynie, Kłaczyna 94A
rated power of PV system 10.01 kWp, energy storage 30 kWh
9) Village hall in Roztoce, ul. 3 Maja 61
rated power of PV system 10.01 kWp, energy storage 20 kWh

The Buyer:
Gmina Dobromierz
Additional information:
Link:
Additional document: ZP.271.3.2026
Link:
Download Full Notice as PDF
Link:
View Full Notice
CPV Code(s):
51112000 - Installation services of electricity distribution and control equipment