The object of this procurement is the conclusion of a contract aimed at Services for Developing the Technical Project and Execution Details, Quality Technical Verification of the Technical Project, Technical Assistance, and Execution of Works for the Investment Objective 'GREEN PROMENADE' - Object No. 2 - Renovation, Rehabilitation, and Consolidation of the Grivița Lake Banks. This investment objective is primarily necessary for the rehabilitation of the bank protection defense to ensure safe exploitation and leisure activities. The role of these hydrotechnical arrangements has been both for leisure and for protection against bank erosion. Currently, the bank defenses are in a state of degradation (in places, very advanced), caused both by the usual action of environmental factors (precipitation, groundwater circulation, freeze-thaw cycle, meteor waters, etc.) and by the absence of regular maintenance works over the entire lifespan of the construction. In terms of green spaces adjacent to the lake, most of them are in a state of severe deterioration, due to both poor maintenance and difficult accessibility in some areas. The Green Promenade project promotes sustainable urban mobility, encourages non-motorized transport, improves urban environmental quality, reduces air pollution, and enhances functional zoning in Sector 1 of Bucharest Municipality.
The main minimal indicators (performance indicators) related to the investment objective in the Feasibility Study content, as these indicators were approved based on the provisions of Art. 7 para. (5) and para. (6) from HG no. 907/2016.
These indicators represent physical elements/physical capacities that indicate reaching the target of the investment objective and/or, as the case may be, in accordance with the standards, norms, and technical regulations in force:
1. Total intervention area = 867,885.52m, of which:
Water mirror area = 764,618.12m;
Green space area = 45,611.40m;
Total Green Promenade area (on land and above water) = 57,656.00m;
2. Total promenade length = 8,409.00m
Pedestrian bridge length = 231m;
Promenade length on land = 2,350.00m
Promenade length above water surface = 5,828.00m
LOT-0000
Default lot.
The object of this procurement is the conclusion of a contract aimed at Services for Developing the Technical Project and Execution Details, Quality Technical Verification of the Technical Project, Technical Assistance, and Execution of Works for the Investment Objective 'GREEN PROMENADE' - Object No. 2 - Renovation, Rehabilitation, and Consolidation of the Grivița Lake Banks. This investment objective is primarily necessary for the rehabilitation of the bank protection defense to ensure safe exploitation and leisure activities. The role of these hydrotechnical arrangements has been both for leisure and for protection against bank erosion. Currently, the bank defenses are in a state of degradation (in places, very advanced), caused both by the usual action of environmental factors (precipitation, groundwater circulation, freeze-thaw cycle, meteor waters, etc.) and by the absence of regular maintenance works over the entire lifespan of the construction. In terms of green spaces adjacent to the lake, most of them are in a state of severe deterioration, due to both poor maintenance and difficult accessibility in some areas. The Green Promenade project promotes sustainable urban mobility, encourages non-motorized transport, improves urban environmental quality, reduces air pollution, and enhances functional zoning in Sector 1 of Bucharest Municipality.
The main minimal indicators (performance indicators) related to the investment objective in the Feasibility Study content, as these indicators were approved based on the provisions of Art. 7 para. (5) and para. (6) from HG no. 907/2016.
These indicators represent physical elements/physical capacities that indicate reaching the target of the investment objective and/or, as the case may be, in accordance with the standards, norms, and technical regulations in force:
1. Total intervention area = 867,885.52m, of which:
Water mirror area = 764,618.12m;
Green space area = 45,611.40m;
Total Green Promenade area (on land and above water) = 57,656.00m;
2. Total promenade length = 8,409.00m
Pedestrian bridge length = 231m;
Promenade length on land = 2,350.00m
Promenade length above water surface = 5,828.00m