Services for Developing the Technical Project and Execution Details, Quality Technical Verification of the Technical Project, Technical Assistance, and Execution of Works for the Investment Objective 'GREEN PROMENADE' – Object No. 2 - Renovation, Rehabilitation, and Consolidation of the Grivița Lake Banks | Tenderlake

Services for Developing the Technical Project and Execution Details, Quality Technical Verification of the Technical Project, Technical Assistance, and Execution of Works for the Investment Objective 'GREEN PROMENADE' – Object No. 2 - Renovation, Rehabilitation, and Consolidation of the Grivița Lake Banks

Contract Value:
RON 269M - 269M
Notice Type:
Contract Notice
Published Date:
15 July 2026
Closing Date:
17 August 2026
Location(s):
RO321 Bucureşti (RO Romania/ROMÂNIA)
Description:
The project focuses on developing technical plans and executing works for the renovation and rehabilitation of Grivița Lake banks to enhance safety, leisure activities, and urban mobility while addressing environmental concerns.

The object of this procurement is the conclusion of a contract aimed at Services for Developing the Technical Project and Execution Details, Quality Technical Verification of the Technical Project, Technical Assistance, and Execution of Works for the Investment Objective 'GREEN PROMENADE' - Object No. 2 - Renovation, Rehabilitation, and Consolidation of the Grivița Lake Banks. This investment objective is primarily necessary for the rehabilitation of the bank protection defense to ensure safe exploitation and leisure activities. The role of these hydrotechnical arrangements has been both for leisure and for protection against bank erosion. Currently, the bank defenses are in a state of degradation (in places, very advanced), caused both by the usual action of environmental factors (precipitation, groundwater circulation, freeze-thaw cycle, meteor waters, etc.) and by the absence of regular maintenance works over the entire lifespan of the construction. In terms of green spaces adjacent to the lake, most of them are in a state of severe deterioration, due to both poor maintenance and difficult accessibility in some areas. The Green Promenade project promotes sustainable urban mobility, encourages non-motorized transport, improves urban environmental quality, reduces air pollution, and enhances functional zoning in Sector 1 of Bucharest Municipality.
The main minimal indicators (performance indicators) related to the investment objective in the Feasibility Study content, as these indicators were approved based on the provisions of Art. 7 para. (5) and para. (6) from HG no. 907/2016.
These indicators represent physical elements/physical capacities that indicate reaching the target of the investment objective and/or, as the case may be, in accordance with the standards, norms, and technical regulations in force:
1. Total intervention area = 867,885.52m, of which:
 Water mirror area = 764,618.12m;
 Green space area = 45,611.40m;
 Total Green Promenade area (on land and above water) = 57,656.00m;
2. Total promenade length = 8,409.00m
 Pedestrian bridge length = 231m;
 Promenade length on land = 2,350.00m
 Promenade length above water surface = 5,828.00m


LOT-0000
Default lot.
The object of this procurement is the conclusion of a contract aimed at Services for Developing the Technical Project and Execution Details, Quality Technical Verification of the Technical Project, Technical Assistance, and Execution of Works for the Investment Objective 'GREEN PROMENADE' - Object No. 2 - Renovation, Rehabilitation, and Consolidation of the Grivița Lake Banks. This investment objective is primarily necessary for the rehabilitation of the bank protection defense to ensure safe exploitation and leisure activities. The role of these hydrotechnical arrangements has been both for leisure and for protection against bank erosion. Currently, the bank defenses are in a state of degradation (in places, very advanced), caused both by the usual action of environmental factors (precipitation, groundwater circulation, freeze-thaw cycle, meteor waters, etc.) and by the absence of regular maintenance works over the entire lifespan of the construction. In terms of green spaces adjacent to the lake, most of them are in a state of severe deterioration, due to both poor maintenance and difficult accessibility in some areas. The Green Promenade project promotes sustainable urban mobility, encourages non-motorized transport, improves urban environmental quality, reduces air pollution, and enhances functional zoning in Sector 1 of Bucharest Municipality.
The main minimal indicators (performance indicators) related to the investment objective in the Feasibility Study content, as these indicators were approved based on the provisions of Art. 7 para. (5) and para. (6) from HG no. 907/2016.
These indicators represent physical elements/physical capacities that indicate reaching the target of the investment objective and/or, as the case may be, in accordance with the standards, norms, and technical regulations in force:
1. Total intervention area = 867,885.52m, of which:
 Water mirror area = 764,618.12m;
 Green space area = 45,611.40m;
 Total Green Promenade area (on land and above water) = 57,656.00m;
2. Total promenade length = 8,409.00m
 Pedestrian bridge length = 231m;
 Promenade length on land = 2,350.00m
 Promenade length above water surface = 5,828.00m

The Buyer:
Sector 1 (Sectorul 1 al municipiului Bucuresti)
Additional information:
Link:
Download Full Notice as PDF
Link:
Additional document: Documentatia de achizitie
Link:
View Full Notice
CPV Code(s):
45111291 - Site-development work
45112700 - Landscaping work
45112711 - Landscaping work for parks
45221100 - Construction work for bridges
45221113 - Footbridge construction work
45233161 - Footpath construction work
45233162 - Cycle path construction work
45233220 - Surface work for roads
45233300 - Foundation work for highways, roads, streets and footpaths
45240000 - Construction work for water projects
45246200 - Riverbank protection works
45246500 - Promenade construction work
45262210 - Foundation work
45316100 - Installation of outdoor illumination equipment
45317000 - Other electrical installation work
71242000 - Project and design preparation, estimation of costs
71300000 - Engineering services
71322000 - Engineering design services for the construction of civil engineering works
71328000 - Verification of load-bearing structure design services
71356200 - Technical assistance services
77310000 - Planting and maintenance services of green areas