High Voltage Systems 70-00001-2720-442
LOT-0001
70-00001-2720 High Voltage Systems.
* Dates for the execution of the main service on the construction site: Start of service 21.11.2025; End of service 29.05.2026
* Description of the procurement:
Project No. 1 - Lot High Voltage Systems
For the new CPS of the Fraunhofer Society Institute IWU in Dresden, the present bill of quantities is to build the high voltage systems, which include the following sub-services (including any quantities): 1 UPS system, 1 emergency lighting system (single battery lights), 1 low-voltage switchgear, 4 low-voltage main distribution boards, 20 sub-distributions, approximately 35 km of cables and lines, approximately 1200 installation devices, laying systems, general lighting, emergency lights and rescue sign lights, fire protection measures, about 21 sqm of control room floor for server and electrical rooms as well as documentation of the entire system.
Project No. 2 - PV System New CPS
Service provision for the installation of a PV system including all ancillary services:
- Establishing connection NSHV
- Cable installation AC and DC
- Consideration of surge protection
- Implementation of energy management system for PV system
- Consideration of fire brigade shutdown using coupler BMA
- Addition or expansion of 4 data ports
- Opening/closing of existing fire compartments
LOT-0002
73-00633-2720 PV System.
* Dates for the execution of the main service on the construction site: Start of service 21.11.2025; End of service 29.05.2026
* Description of the procurement:
Project No. 1 - Lot High Voltage Systems
For the new CPS of the Fraunhofer Society Institute IWU in Dresden, the present bill of quantities is to build the high voltage systems, which include the following sub-services (including any quantities): 1 UPS system, 1 emergency lighting system (single battery lights), 1 low-voltage switchgear, 4 low-voltage main distribution boards, 20 sub-distributions, approximately 35 km of cables and lines, approximately 1200 installation devices, laying systems, general lighting, emergency lights and rescue sign lights, fire protection measures, about 21 sqm of control room floor for server and electrical rooms as well as documentation of the entire system.
Project No. 2 - PV System New CPS
Service provision for the installation of a PV system including all ancillary services:
- Establishing connection NSHV
- Cable installation AC and DC
- Consideration of surge protection
- Implementation of energy management system for PV system
- Consideration of fire brigade shutdown using coupler BMA
- Addition or expansion of 4 data ports
- Opening/closing of existing fire compartments