Comprehensive modernization of the "Lis" Water Treatment Station and modernization of the water supply network in Kalisz along with a hydrodynamic model of its operation
Contract Value:
-
Notice Type:
Contract Notice
Published Date:
03 November 2026
Closing Date:
18 November 2026
Location(s):
PL41 Wielkopolskie (PL Poland/POLSKA)
Description:
Comprehensive modernization of the Lis Water Treatment Station in Kalisz aims to enhance water supply safety, improve technological reliability, and increase energy efficiency through various construction and technological upgrades.
Modernization of the LIS water treatment station in Kalisz The subject of the contract includes the comprehensive modernization of the Lis Water Treatment Station, aimed at increasing the safety of water supplies intended for human consumption, improving the reliability of technological processes, reducing the risk of failure, and increasing the energy efficiency of the facility. The scope of the order includes mutually related construction, technological, sanitary, electrical works, as well as automation and control, in particular: • replacement of filtration drainage along with adapting the filter system, • modernization of filtration chambers and clear water tanks, • replacement of technological fittings with electric drives • and integration with the control system, • modernization of the disinfection process through the installation of UV systems, • modernization of water pumping stations including the use of frequency converters, • modernization of low voltage power supply systems and ACS (Automation, Control and Measurement) systems including adjustment of control software, • performing maintenance of all devices and installations during the warranty and guarantee periods, including spare parts, consumables, and all necessary elements required for the trouble-free operation of all devices and installations, in accordance with manufacturers' requirements and those contained in operating manuals, operation instructions, warranty cards, and documentation developed for installed equipment, fittings, automation, and other materials. Category: Construction works / Construction works CPV: 31682210-5 Control equipment and apparatus, 45000000-7 Construction work, 45231300-8 Construction work for water supply and sewage pipelines, 45232430-5 Water treatment works, 45252126-7 Construction works for drinking water treatment plants, 45310000-3 Electrical installation work, 45311200-2 Electrical installation work, 45330000-9 Plumbing, heat and air-conditioning installation work, 45450000-6 Finishing construction work, other Place of execution: Kalisz, Greater Poland Voivodeship Warranty period: 60 months Evaluation criteria of bids: - The total gross price will be assessed under this criterion. The evaluation of the “price” criterion will be carried out according to the formula:
The maximum score for this criterion is 100 points.
Participation conditions: - Economic and financial standing: Contractors who are in an adequate economic or financial position may apply, i.e. having liability insurance for their business activity with a guaranteed sum of not less than PLN 20,000,000.00. - Knowledge and experience: Contractors who have adequate experience may apply, i.e. in the 7 years before the bid submission deadline, or shorter if their operating period is shorter, have duly completed: a) at least 1 (one) contract (agreement, contract, order) for construction works meeting simultaneously the following conditions: • the value of the completed contract was at least PLN 12,000,000.00 net, • the scope of construction works included modernization, reconstruction or extension of a water treatment plant using open filters; b) at least 1 (one) contract for construction works meeting simultaneously the following conditions: • the value of the completed contract was not less than PLN 10,000,000.00 net, • the scope of works in the completed contract included modernization, reconstruction or extension of a water treatment plant or sewage treatment plant or booster station or pumping station.
NOTE: the construction work under condition b) above must be separate from the work indicated in a) above; in other words, the Contractor must demonstrate at least 2 (two) construction projects in total. - Personnel capable of performing the contract: Contractors who have or will have appropriate staff for the performance of the contract may apply:
a) one person acting as construction manager, holding construction qualifications to manage construction works in the installation specialty regarding networks, installations and thermal, ventilation, gas, water, and sewage devices without restrictions or equivalent, issued under previous construction regulations, with experience in the role of construction manager gained in at least one contract meeting simultaneously the following conditions: • the role of construction manager was held for at least one year, including completion and acceptance of the investment, • the contract value was at least PLN 5,000,000.00 net, • the contract included construction works for modernization, reconstruction or extension of a water treatment plant or sewage treatment plant or booster station or pumping station;
b) at least one person acting as site manager holding qualifications to manage construction works in the structural-construction specialty without restrictions and having experience as site manager or construction manager in at least one contract meeting simultaneously the following conditions: • the role of site manager or construction manager was held for at least one year, • the contract included construction works for modernization, reconstruction or extension of a water treatment plant or sewage treatment plant or booster station or pumping station;
c) at least one person acting as site manager holding qualifications to manage construction works in installation specialty regarding electrical and power networks, having experience as site manager or construction manager in at least one contract meeting simultaneously the following conditions: • the role of site manager or construction manager was held for at least one year, • the contract included construction works for modernization, reconstruction or extension of a water treatment plant or sewage treatment plant or booster station or pumping station.
The Buyer:
Przedsiębiorstwo Wodociągów i Kanalizacji z siedzibą w Kaliszu