On the territory of E.ON South-Transdanubian Power Grid Ltd., Battery Factory I. 132/22 kV substation with 132 kV supply by Iváncsa - Iváncsa Akku A 132 kV single-system ground cable and optical connection.
Within the framework of a business contract, in the area of E.ON Dél-dunántúli Electricity Grid Ltd., Battery Factory I. 132/22 kV substation is fed 132 kV Iváncsa - Iváncsa Akku A 132 kV single-system ground cable and optical connection (NAF ground cable installation)
The tasks of the contractor shall be to implement the export plan documentation as follows:
On the territory of E.ON South-Transdanubian Power Grid Ltd., Battery Factory I. 132/22 kV substation 132 kV feed Iváncsa - Iváncsa Akku All works related to the establishment of a 132 kV single-system ground cable and optical connection:
- construction of 1x0.57 km 132 kV cable line in a densely improved environment;
- optical networking on the track of the 132 kV cable.
The data and information described in points II.1.4) and II.2.4) of the invitation are for informational purposes only, the detailed conditions are set out in the draft contract and the technical specifications. Further details of the task are provided in the procurement documents.
The Contracting Authority shall provide a reserve, the amount of which shall be 10 % of the lump sum tender price, subject to the conditions laid down in Article 322/2015. (X. 30) Section 20 of the Government Decree.