Municipal TOP Plus Renovation in Sopron

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
27 April 2026
Closing Date:
05 May 2026
Location(s):
HU221 Győr-Moson-Sopron (HU Hungary/MAGYARORSZÁG)
Description:
The project aims to renovate and improve the road surfaces of several streets in Sopron while maintaining traffic flow, including urban collector roads, expansion of traffic-calmed areas, and specific road sections like Balfi road.

The main goal of the project is to implement complex road surface renovation and condition improvement works affecting several streets in the Sopron road network while maintaining traffic. The procedure consists of the following parts: 1. Renovation of urban collector roads Phase I 2. Expansion of the traffic-calmed area of Kisvárkerület from the Hűség well to Ógabona square 3. Comprehensive renovation of Balfi road between the bypass road and Híd street


LOT-0001
EKR002499132025/1
Renovation of urban collector roads Phase I.
The main goal of the project is to implement complex road surface renovation and condition improvement works affecting several streets in the Sopron road network while maintaining traffic. The current investment requires a construction permit as detailed below. Renovation of urban collector roads Phase I Planned interventions: Renovation of the pavements of internal roads in Sopron in 23 streets, totaling 7991 m in length. During the renovation, the existing pavement will be renewed in one or two layers, with local surface settlements adjusted and sidewalk connections corrected where necessary. Damaged raised borders found on the sections will also be renovated. In several cases, the leveling of manhole and stormwater cover plates will take place. Road markings will also be painted throughout the section. The renovation works must be carried out while maintaining traffic; complete closure of the road section to traffic is not permitted during the execution period. Affected road segments, main quantities Streets Length of sections to be renovated (m) 1. Somfalvi street I section 425.00 2. Somfalvi street II section 275.00 3. Somfalvi street III section 757.90 permit required 4. Újteleki street 316.00 5. Hunyadi street 398.25 6. Csatkai street 423.00 7. Kismartoni row 263.00 8. Borsmonostori street 224.25 9. Erzsébet street 360.50 permit required 10. Kodály square 200.60 11. Höflányi street 332.00 12. Kistómalom street 583.10 13. Szent Mihály street 271.00 14. Hársfa row 430.85 15. Házi Jenő street 74.80 16. Sport street 522.00 17. Manninger street 200.55 18. Zrínyi street 348.30 Main quantities: Construction and demolition of temporary traffic diversion (main and side roads): 6406 m Quantity of asphalt to be installed: 3496.5 m3 Curb construction (raised, recessed, garden, “K” curb): 7732 m Leveling of manhole and wastewater cover plates: 366 pcs Line marking: 555 m2 Optional package Streets Length of sections to be renovated 19. Csőszházdűlő (120 m) 109.76 permit required 20. Hubertusz street (230 m) 193.00 permit required 21. Ipar krt 739.16 permit required 22. Sörházdombi street 430.80 23. Szent Lélek street 112.55 permit required Main quantities: Construction and demolition of temporary traffic diversion (main and side roads): 1585.27 m Quantity of asphalt to be installed: 827.2 m3 Curb construction (raised, recessed, garden, “K” curb): 3228 m Leveling of manhole and wastewater cover plates: 56 pcs Line marking: 155 m2 The planned length of project sections: 7991.27 m (base package 6406 m, optional package: 1585.27 m). 12/2025. (V. 8.) ÉKM decree 82. § (1) paragraph applies: For construction products with short delivery and processing times, the maximum transport distance between the place of manufacture and the place of processing may be: for rolled asphalt, a maximum of 80 kilometers. The nature of the construction investment and its total quantity, as well as the detailed definition of requirements and specifications, are contained in the issued technical documentation and the cost estimate to be priced. To clearly and understandably determine the subject of the public procurement, the Contracting Authority may refer to products, origins, types, processes, activities, persons, or patents or trademarks specified in this call and other procurement documents. In every such case, the designation has only occurred for the clear definition of the nature of the subject; offers can be made for products specified in this call or equivalent products concerning detailed technical parameters for the given product. In evaluating the technical content, equivalence must be judged by the Contracting Authority, and the bidder must provide all the data for this decision. It is the obligation of the bidder to prove in the offer that the offered product is equivalent to the product specified by the Contracting Authority. Offers can also be made for products with more favorable characteristics than these.


LOT-0002
EKR002499132025/2
Expansion of the Kisvárkerület traffic-calmed area.
The main goal of the project is to implement complex road surface renovation and condition improvement works affecting several streets in the Sopron road network while maintaining traffic. This investment requires a construction permit. Expansion of the traffic-calmed area of Kisvárkerület from the Hűség well to Ógabona square Planned interventions: From the total area of 8,000 m2, the executive plans for the 6,400 m2 area were completed in 2017, and in 2023, revised permit plans for the renewed Hűség Park were created. The current executive plan documentation includes the exact definition and various corrections. A few elements listed in earlier plans but not realized will be constructed in the Hűség Park area: drinking fountain, information board, street lanterns. Renovation of the section between Major street and Lackner Kristóf street, asphalt carpeting and sidewalk surface replacement while keeping the borders, area ~ 850 m2. Renovation of the pedestrian street section of Színház street, sidewalk surface replacement, similarly from wall to wall, area ~ 400 m2. Renewal of Színház square. Sidewalk surface replacement while keeping the curbs, tree planting, and transformation of green areas, area ~ 1,100 m2. The road surface of Várkerület will be renovated while maintaining the current road level, except for the pedestrian bridge that will be raised to pedestrian level. The Kisvárkerület parking lot will be completely demolished, and the sidewalks and mixed-use service surfaces will be rebuilt. New stormwater drainage main network will be constructed in front of properties no. 10 and 16 on Várkerület. A concrete sedimentation cleaning well will be installed. The drainage of the pavement will be ensured by concrete water absorbing wells. The drainage of the sidewalk surface will be ensured not only by the water absorbers but also by slot drains and long gratings. The renovation works must be carried out while maintaining traffic; complete closure of the road section to traffic is not permitted during the execution period. Main quantities: Demolition of prefabricated concrete curbs (raised, sloped, recessed, “K”) 769 m Demolition of hydraulic binding pavement bases 1040.9 m3 Construction of 6 cm thick clinker paving elements with bedding, joint filling 2049 m2 Construction of 8 cm thick clinker paving elements 2666 m2 Construction of crushed stone bedding (KZ, NZ, Z) 450 m3 Construction of recessed curbs in granite 1356 m Construction of raised curbs from prefabricated concrete elements 669 m Construction of sandy gravel pavement base (HK) 765.4 m3 Stabilized gravel pavement base mixed on site with CKt-4 cement 865.5 m3 Compaction of soil in excavation 4829 m2 Planting of 40/60 cm quality shrubs with aftercare 1582 pcs Planting of 40/60 cm quality evergreen trees with aftercare 1445 pcs Planting of potted perennials for 8 years with aftercare 722 pcs Construction of road and street lighting, wiring construction 1681 m Construction of cross culverts Ø ≤ 30 cm 312 m Construction of long drainage 52 m The planned length of project sections: 295 m. 12/2025. (V. 8.) ÉKM decree 82. § (1) paragraph applies: For construction products with short delivery and processing times, the maximum transport distance between the location of manufacture and the processing site may be: for rolled asphalt, a maximum of 80 kilometers. The nature of the construction investment and its total quantity, as well as the detailed definition of requirements and specifications, are contained in the issued technical documentation and the cost estimate to be priced. To clearly and understandably determine the subject of the public procurement, the Contracting Authority may refer to products, origins, types, processes, activities, persons, or patents or trademarks specified in this call and other procurement documents. In every such case, the designation has only occurred for the clear definition of the nature of the subject, offers can be made for products specified in this call or equivalent products concerning detailed technical parameters for the given product. In evaluating the technical content, equivalence must be judged by the Contracting Authority, and the bidder must provide all the data for this decision. It is the obligation of the bidder to prove in the offer that the offered product is equivalent to the product specified by the Contracting Authority. Offers can also be made for products with more favorable characteristics than these.


LOT-0003
EKR002499132025/3
Renovation of Balfi road between the bypass road and Híd street.
The main goal of the project is to implement complex road surface renovation and condition improvement works affecting several streets in the Sopron road network while maintaining traffic. This investment requires a construction permit. Comprehensive renovation of Balfi road between the bypass road and Híd street Planned interventions: The length of the road to be renovated is 1018 m, with a characteristic roadway width of 8.0 m. In front of the even-numbered house row, a 934 m long, 4.25 m wide separate sidewalk and two-way bicycle path will be built. The existing sidewalk in front of the odd-numbered house row will be renovated to its current dimensions, at least 1.50 m wide, and completed where sections are missing. The planned parking lanes will provide parking spaces for a total of 124 vehicles. Three designated pedestrian crossings will be constructed - made accessible - on the planned road sections. Reconstruction of two existing bus stops will also take place. The existing stormwater channel will be renovated, and where it does not exist, a new stormwater channel will be built. The street lighting will be renovated, and trees and shrubs will be planted. The renovation works must be carried out while maintaining traffic; complete closure of the road section to traffic is not permitted during the execution period. Main quantities: Demolition of asphalt pavement tablets 10136 m3 Construction of 8 cm thick paving stone paving with bedding, joint filling 3255 m2 Installation of woven geotextile with tensile strength > 40 kN/m (in both directions) 16100 m2 Other special shoring of work pits 7606 m2 Construction of road and street lighting (insulated) 4601 m Construction of road surface markings (cold, hot plastic, colored) 266 m2 Construction of AC 16 binder (F) B 50/70 layer 481 m3 Construction of AC 22 base (F) B 50/70 layer 673 m3 Construction of water and sewer lines from UPE pipe 1088 m The planned length of project sections: 1018 m. 12/2025. (V. 8.) ÉKM decree 82. § (1) paragraph applies: For construction products with short delivery and processing times, the maximum transport distance between the location of manufacture and the processing site may be: for rolled asphalt, a maximum of 80 kilometers. The nature of the construction investment and its total quantity, as well as the detailed definition of requirements and specifications, are contained in the issued technical documentation and the cost estimate to be priced. To clearly and understandably determine the subject of the public procurement, the Contracting Authority may refer to products, origins, types, processes, activities, persons, or patents or trademarks specified in this call and other procurement documents. In every such case, the designation has only occurred for the clear definition of the nature of the subject; offers can be made for products specified in this call or equivalent products concerning detailed technical parameters for the given product. In evaluating the technical content, equivalence must be judged by the Contracting Authority, and the bidder must provide all the data for this decision. It is the obligation of the bidder to prove in the offer that the offered product is equivalent to the product specified by the Contracting Authority. Offers can also be made for products with more favorable characteristics than these.

The Buyer:
Magyar Közút Nonprofit Zártkörűen Működő Részvénytársaság
Additional information:
Link:
Download Full Notice as PDF
Link:
Additional document: DOC-01
Link:
View Full Notice
CPV Code(s):
45000000 - Construction work
45233140 - Roadworks
45233221 - Road-surface painting work
45233228 - Surface coating construction work