Description:
Comprehensive modernization of the LIS Water Treatment Station in Kalisz aims to enhance water supply safety, improve process reliability, and increase energy efficiency through various construction and technological upgrades.
Modernization of the LIS Water Treatment Station in Kalisz
Estimated value: PLN 21,000,000.00
Task entitled "Modernization of the LIS Water Treatment Station in Kalisz as part of the project "Comprehensive modernization of the LIS Water Treatment Station" and modernization of the water supply network in Kalisz along with a hydrodynamic model of its operation" within the FENX.02.05 Drinking Water priority action FENX.02 Support for energy and environmental sectors from the European Regional Development Fund co-financed under the European Funds for Infrastructure, Climate, Environment 2021-2027 program.

The subject of the contract includes a comprehensive modernization of the Lis Water Treatment Station aimed at increasing the safety of water supply intended for human consumption, improving the reliability of technological processes, reducing the risk of failures, and increasing the energy efficiency of the facility.
The scope of the contract covers mutually related construction, technological, sanitary, electrical works as well as automation and control, in particular:
• replacement of the filtration drainage along with adaptation of the filter system,
• modernization of filtration chambers and clear water tanks,
• replacement of technological fittings together with electric drives and integration with the control system,
• modernization of the disinfection process through installation of UV equipment,
• modernization of the water pumping station including use of frequency converters,
• modernization of low voltage power systems and AKPiA systems including adaptation of control software.

Attention!
Due to the use of the limit on the number of attachments to the procedure (max. 50 attachments), the Water Supply and Sewerage Company Ltd. headquartered in Kalisz informs that all attachments to the procedure are posted and can be found at the link:

https://www.platformazakupowa.pl/transakcje/1361152

in the "Attachments to the procedure" tab.

Attachments will be added continuously and will be located at the link:

https://www.platformazakupowa.pl/transakcje/1361152

in the "Attachments to the procedure" tab.

The link to the bid opening will also be posted at the link:

https://www.platformazakupowa.pl/transakcje/1361152

in the "Attachments to the procedure" tab.
Category: Construction works / Construction works
CPV: 31682210-5 Control apparatus and equipment, 45000000-7 Construction work, 45231300-8 Construction work for water and sewage pipelines, 45232430-5 Water treatment works, 45252126-7 Construction works for drinking water treatment plants, 45310000-3 Electrical installation work, 45311200-2 Electrical installation works, 45330000-9 Water supply and sanitary installation works, 45450000-6 Other finishing construction works
Place of performance: whole Poland
Warranty period: 60 months
Evaluation criteria for bids:
- When choosing the most advantageous offer, the contracting authority will apply the following evaluation criteria:
1) Gross price (C) – weighting 100%

Participation conditions:
- Authorization to perform specific activities or tasks: The contractor conducting business or professional activity will meet the condition if they demonstrate that they conduct the subject business or professional activity in the industry appropriate for the order and are entered in one of the professional or commercial registers kept in the country where they have their registered office or residence.
- Economic and financial situation: The contractor will meet the condition if they demonstrate possession of civil liability insurance related to the activity connected with the subject of the order, for a guaranteed sum not less than PLN 5,000,000.00.
- Persons able to perform the contract: a) The contracting authority must indicate and have the following persons assigned to implement the contract:
- one Construction Manager meeting the following requirements jointly:
holds construction qualifications to manage and supervise construction works in the installation specialty concerning networks, installations and devices: water supply and sewage, heating, ventilation and gas without limitation or equivalent,
these qualifications must have been held for at least 3 years (date of the authority’s decision conferring construction qualifications) before the date of submission of this offer,
has experience as construction manager during execution of construction works within one contract meeting jointly the below conditions:
the function of construction manager was held for at least 6 months,
the contract value was not less than PLN 5,000,000.00 net involving works during reconstruction, expansion or superstructure of an active water and sewage management facility (water treatment plant, sewage treatment plant, pumping station, booster station),
the construction manager function was held on a completed and accepted contract by the contracting authority, including during the period of completion and acceptance of the contract.
- one Works Manager in the construction and building branch meeting jointly the following requirements:
holds unlimited qualifications to manage construction works in the construction and building specialty,
has held these qualifications for at least 3 years (date of the authority’s decision conferring construction qualifications) before the date of submission of this offer,
has experience as a works manager in the specialty or as construction manager during execution of construction works within one contract meeting jointly the below conditions:
the function of works manager was held for at least 6 months,
the works were conducted during reconstruction, expansion or superstructure of an active water and sewage management facility (water treatment plant, sewage treatment plant, pumping station, booster station).
- one Works Manager in the electrical and/or power electrical branch meeting jointly the following requirements:
holds qualifications to supervise electrical installation construction works,
these qualifications were obtained at least 3 years (date of the authority’s decision conferring construction qualifications) before the date of submission of this offer,
has experience as works manager or construction manager during execution of construction works within one contract meeting jointly the below conditions:
the function of works manager was held for at least 6 months,
the works were conducted during reconstruction, expansion or superstructure of an active water and sewage management facility (water treatment plant, sewage treatment plant, pumping station, booster station).
- Knowledge and experience: The contractor must demonstrate that in the last 5 years before the deadline for submission of bids, or if the period of business activity is shorter, during that period, they have properly executed:
- at least one contract (in consortium or individually) for construction works meeting jointly the following conditions:
the value of the executed contract (agreement) not less than PLN 15,000,000.00 net,
the scope of construction works of the executed contract included modernization, reconstruction, or expansion of a water and sewage management facility – water treatment plant with use of open filters,
- at least one contract (in consortium or individually) for construction works meeting jointly the following conditions:
the value of the executed contract (agreement) not less than PLN 10,000,000.00 net,
the scope of construction works of the executed contract included modernization, reconstruction, or expansion of a water and sewage management facility (water treatment plant, sewage treatment plant, pumping station, booster station), and the scope of works was comparable with this subject.
- Additional participation conditions: Mandatory site inspection, in accordance with the provisions of section V of the ToR (site inspection).
The Buyer:
Przedsiębiorstwo Wodociągów i Kanalizacji Spółka z o.o. z/s w Kaliszu
Magdalena Włodarek; Anna Kędzia
Nowy Świat 2a
Kalisz
62-800
PL
Email:
przetargi@wodociagi-kalisz.pl
Phone:
627608065
Additional information:
Link:
PW-2_BO_Rys_3.pdf
Link:
Załącznik nr 4 do SWZ - Potencjał osobowy.docx
Link:
PW-2_BO_Rys_4.pdf
Link:
Załącznik nr 7 do SWZ - Ośw..o.przy.do.tej.samej.grup.kapit.lubbraku.przynależ..docx
Link:
Załącznik nr 8 do SWZ - Ośw.Wyk.o.akt.inf.zaw.w.ofercie.docx
Link:
PW-2_BO_Rys_16.pdf
Link:
PW-2_BO_Rys_17.pdf
Link:
PW-2_BO_Rys_6.pdf
Link:
ST-06 - ROBOTY SPAWALNICZE INST.TECH..docx
Link:
PW-2_BO_Rys_9.pdf
Link:
PW-2_BO_Rys_12.pdf
Link:
Załącznik nr 11 do SWZ - Umowa NDA.docx
Link:
Załącznik nr 10 do SWZ - Oświad.dot.niewystąp.konf.inter..docx
Link:
PW-2_BO_Rys_13.pdf
Link:
Załącznik nr 3 do SWZ - Wykaz robót.docx
Link:
Załącznik nr 9 - Ośw.o.speł.wym.w.zakr.upraw.do.udz.w.ryn.zam..docx
Link:
PW-2_BO_Rys_15.pdf
Link:
Załącznik nr 13 do SWZ - DNSH_sprawozdanie.docx
Link:
Załacznik nr 15 do SWZ - Regulamin Porządkowy PWiK.docx
Link:
ST-05 - INSTALACJE AKPIA.docx
Link:
PW-2_BO_Rys_8.pdf
Link:
PW-2_BO_Rys_7.pdf
Link:
DPW_PV-01.pdf
Link:
Załacznik nr 6 do SWZ - Ośw.Wykon.,Wykon.wpól.ubieg.się.o.udziel.zam.dot.przes.wykl.z.art.5A.docx
Link:
View on Baza Konkurencyjności
Link:
PW-2_BO_Rys_2.pdf
Link:
PW-2_BO_Rys_1.pdf
Link:
PW-2_BO_Opis techniczny.pdf
Link:
PW-2_BO str tytułowa.pdf
Link:
ST-03 - INSTALACJE TECHNOLOGICZNE.docx
Link:
ST-04 - INSTALACJE ELEKTRYCZNE.doc
Link:
PW-2_BO_Rys_10.pdf
Link:
PR-2_BO STR. TYTUŁ..pdf
Link:
PR-4_AKP.pdf
Link:
Załącznk nr 12 do SWZ - Klauzula RODO.docx
Link:
Załącznik nr 1 do Formularza Ofertowego (SWZ) - Konstrukcje budowlane.pdf
Link:
PW-2_BO_Rys_14.pdf
Link:
Załącznik nr 4 do Formularza Ofertowego (SWZ) - Instalacje AKPiA.pdf
Link:
ST-02 - Konstrukcje stalowe.docx
Link:
PW-2_BO_Rys_11.pdf
Link:
PW-2_BO_Rys_18.pdf
Link:
SWZ SUW LIS z podpisem.pdf
Link:
Załącznik nr 1 do SWZ - Formularz Ofertowy.docx
Link:
Załacznik nr 5 do SWZ - Ośw.o speł.war.udz.w.post.Ośw.dot.przesł.wykl.z.post..docx
Link:
Załącznik nr 2 do SWZ - Projektowane Postanowienia Umowy.docx
Link:
PW-2_BO_Rys_5.pdf
Link:
ST-01 - Konstrukcje budowlane.docx
Link:
Załącznik nr 3 do Formularza Ofertowego (SWZ) - Instalacje elektryczne.pdf
Link:
Załącznik nr 2 do Formularza Ofertowego (SWZ) - Instalacje technologiczne.pdf
Link:
Załącznik nr 14 do SWZ - Potwierdzenie odbycia wizji lokalnej.docx
Link:
ST-00 WYMAGANIA OGÓLNE.docx
CPV Code(s):
31682210 - Instrumentation and control equipment
45000000 - Construction work
45231300 - Construction work for water and sewage pipelines
45232430 - Water-treatment work
45252126 - Drinking-water treatment plant construction work
45310000 - Electrical installation work
45311200 - Electrical fitting work
45330000 - Plumbing and sanitary works
45450000 - Other building completion work