Development and Modernization of Sewerage Facilities in the Iwanowice Municipality | Tenderlake

Development and Modernization of Sewerage Facilities in the Iwanowice Municipality

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
19 October 2026
Closing Date:
20 October 2026
Location(s):
PL21 Małopolskie (PL Poland/POLSKA)
Description:
The project involves the design and construction of the modernization and expansion of the Wastewater Treatment Plant in Iwanowice, including comprehensive design documentation, construction works, and necessary administrative approvals to enhance wastewater treatment capabilities.
CHANGE OF ANNOUNCEMENT no. 2026-94948-293796 (version published on 2026-10-19). Current content of the announcement below; original announcement – see link.

MODERNIZATION AND EXPANSION OF THE WASTEWATER TREATMENT PLANT IN IWANOWICE
The subject of the contract is the comprehensive execution of the task named: Modernization and expansion of the Wastewater Treatment Plant in Iwanowice – STAGE I in the design and build formula. The implementation of the investment includes the preparation of full multi-branch design documentation, obtaining all legally required consents, opinions, administrative decisions, and permits, execution of construction and assembly works, conducting technological start-up, staff training, and handing over the facilities for use.
2. Basis for task execution.
All design work as well as construction, assembly, and installation works must be carried out strictly based on the attached Functional and Utility Program (PFU) and detailed arrangements and guidelines agreed upon at the design and execution stages with the operator of the wastewater treatment plant. The Contractor is obliged to coordinate design solutions and the work schedule continuously with the operator to ensure uninterrupted operation of the existing facility and to prevent disruptions in the wastewater treatment process. Although Stage I of the investment is currently being implemented, other PFU assumptions beyond the current stage must be considered so that the designed solutions do not conflict in the future with the implementation of the remaining scope included in the PFU, and are adapted to the overall assumptions of this document, especially regarding the capacity of individual devices and their location.
3. Requirements regarding the design stage and administrative decisions.
During the design phase, the Contractor is obliged to perform all necessary formal and legal activities, including obtaining and preparing documents required to start and complete the investment process. Specifically, the Contractor’s responsibilities include:
• Conducting a detailed inventory of the area covered by the investment and preparing a map for design purposes at a scale of 1:500.
• Performing necessary geotechnical and hydrogeological studies to ensure proper foundation of the facilities.
• Preparing an environmental impact report or information card for the project, if required by the competent authorities.
• Developing a complete multidisciplinary Construction Design, Detailed Designs, and Technological Design.
• Obtaining on behalf of the Ordering Party all necessary administrative decisions, including environmental conditions decisions (if required), decisions on the location of a public-purpose investment or excerpts from the local spatial development plan, technical conditions for media connections (if applicable), and any consents from experts (including fire protection and occupational health and safety).
• Obtaining the final building permit decision or making an effective notification of construction works. Obtaining these documents is an absolute condition before commencing any construction works on site.
4. Detailed scope of construction and assembly works (Stage I)
The scope of works under Stage I includes, in particular, the following technological and construction elements:
A. Construction of a wastewater retention tank:
• Construction of a reinforced concrete tank on plot no. 358/2 in Iwanowice Dworskie, recessed into the ground with an active volume of 150 cubic meters.
• Construction of the tank bottom with a minimum slope of 5 percent towards the drain channel to facilitate cleaning and emptying.
• Laying a DN300 raw sewage pipeline connecting the new tank with existing facilities to ensure proper mixing of sewage.
• Installation of a slow-speed mixer adapted to the tank volume.
B. Modernization and reconstruction of the existing first-stage pumping station:
• Cleaning pumping station wall surfaces with high-pressure water, removing degraded layers, and repairing plaster losses.
• Cleaning and corrosion protection of steel elements of the raw sewage pumping station shelter. Severely corroded elements must be replaced with new ones.
• Replacement of worn-out technological equipment and fittings inside the raw sewage pumping station (including hatches, valves, probes, cables, ladders, sensors, wiring).
• Repair of structural cracks by pressure injection of polyurethane resin and repair of concrete surfaces with polymer-cement repair mortars type PCC I designed for dynamic loads.
• Supply and installation in the pumping station inflow channel of a new automatic step bar screen made entirely of stainless and acid-resistant steel with the screen spacing adapted to the flow parameters specified in the PFU. The screen must be equipped with an integrated screenings compactor-washer, a brush cleaning system for emergency stages, an automatic screenings discharge system to a sealed container, and a hermetic enclosure preventing odor emissions.
• Integration of the new screen with the automation system, including installation of sewage level sensors before and after the screen for automatic control based on level differences or preset time.
• Replacement of submersible pumps in the raw sewage pumping station with new factory-new units of higher efficiency, equipped with clog-resistant impellers, along with replacement of coupling bases, pipe guides, stainless steel discharge pipelines, as well as shut-off and check valves.
• Inclusion of installation of new electric hoists for each pump.
• Replacement and modernization of internal electrical installations, installation of new lighting, and modernization of supply and exhaust ventilation to ensure required air exchange.
• Inclusion of solutions enabling the transport of generated waste within the facility (e.g., via screw conveyors).
C. Modernization of the treatment technology line:
• Construction and installation of a new sand trap on plot no. 358/2 in Iwanowice Dworskie, located on the existing line between the pumping station and primary settler. The sand trap structure must be made entirely of stainless and acid-resistant steel, hermetically closed, insulated, and equipped with a winter heating system. The minimum capacity of the sand trap must be 50 cubic meters per hour, and sand removal efficiency must reach at least 90 percent for granulation above 0.2 millimeters. The facility should be equipped with a sand washer, a linear floor drain connected to internal sewage, and a bypass system with electrically driven gates allowing bypassing the sand trap and controlling the sewage flow (including redirecting flow to an existing anoxic chamber). Communication paths enabling removal and transport of generated waste must be designed within the facility.
• Modernization of the primary settler by constructing a reinforced concrete protective-strengthening jacket at least 22 cm thick and raising the settler walls by at least 70 cm. Construction of a clarified sewage trough around the perimeter with a triangular pilaster overflow. Installation of a submersible pump in the sedimentation chamber and construction of an automatic installation for collecting floatables (floating parts) from the surface using a submersible funnel.
• Relocation and reinstallation of the existing step bar screen before the receiving station of delivered sewage. The connection flange must allow connection of a vacuum truck in a way enabling sewage discharge from the cesspool truck onto the screen. The screen must be installed to allow gravity discharge of delivered sewage from the vacuum truck and then gravity flow to the receiving station. A hardened and covered place for a container for collecting screenings from the screen must be provided. The container location should allow pickup by a truck. A grate with drainage to internal sanitary sewage must be made where the container stands.
D. Mechanical, installation, and protective works on existing facilities:
• Thorough cleaning, sandblasting, and application of anti-corrosion protective coatings on existing technological tanks along with their working platforms and supporting structures.
• Replacement of aeration diffusers in 4 activated sludge chambers and in the oxygen stabilization chamber. New factory-new diffusers with high oxygen transfer efficiency are required and mandatory replacement of all clamps securing aeration grids to tank bottoms with new stainless steel clamps. If defects of existing aeration grids are found, they must be replaced with new ones.
• Replacement of the oxygen meter installed in the third aeration chamber with a new device compatible with the control system, including calibration.
E. Electrical installations, automation, and instrumentation (AKPiA):
• Expansion of the existing main and control switchgear of the wastewater treatment plant to supply new consumers.
• Construction of external and internal power and electrical installations supplying newly installed equipment.
• If defects or corrosion of existing electrical installation components are found within modernized facilities, their replacement with new ones must be foreseen.
• Installation of lightning protection, equipotential bonding, and external area lighting.
• Supply, installation, and commissioning of a complete automation system, measurement instrumentation (AKPiA), and integration of all new signals (including operating states, failures, level measurements before and after the screen, levels in the pumping station, flow measurements, methane and hydrogen sulfide concentrations, valve operations) into the main control and visualization system of the treatment plant.
Due to limited character count, further information is contained in the Annex - DESCRIPTION OF THE SUBJECT OF THE CONTRACT
Category: Construction works / Construction works
CPV: 45232420-2 Sewer works, 45252000-8 Construction works for water treatment, purification and waste incineration plants, 71220000-6 Architectural design services, 71320000-7 Engineering design services, 71340000-3 Integrated engineering services
Place of execution: Iwanowice Dworskie, Iwanowice Municipality, Kraków County, Lesser Poland Voivodeship
Evaluation criteria:
- Net price - weighting 60
- Warranty service response time for commencing repair - weighting 20
- Social aspect – employment based on employment contract - weighting 20

Participation conditions:
- Knowledge and experience: 6.1. The Ordering Party defines the participation conditions in this procedure.
6.2. In the procedure may participate a Contractor who:
6.2.1. is not subject to exclusion under the conditions specified in the Request for Quotations and meets the conditions defined by the Ordering Party for participation.
6.2.2. Demonstrates having completed one or a maximum of two construction works involving construction, reconstruction, or modernization of water and sewage infrastructure (including: wastewater treatment plants, water treatment stations, technological facilities, or water/sewer networks with accompanying infrastructure) with a total value not less than PLN 1,000,000 gross.
6.2.3. Demonstrates having civil liability insurance for business activities related to the subject of the contract with a sum insured of not less than PLN 1,000,000.
6.3. If relying on the experience of a third party, that entity must have performed the construction works for which the capabilities are required.
The Buyer:
Gmina Iwanowice
Monika Mrówka
Ojcowska 11
Iwanowice Wloscianskie
32-095
PL
Email:
mmrowka@iwanowice.pl
Phone:
12 388 40 03
Additional information:
Link:
Załącznik 6 - Wykaz zrealizowanych zamówień.doc
Link:
Zał. 5 - Zobowiązanie podmiotu trzeciego.doc
Link:
Zał. 2 - Formularz ofertowy.docx
Link:
Zał. 3 - Projektowane postanowienia umowy.docx
Link:
Załącznik 1 OPZ .pdf
Link:
PFU oczyszczalnia - 19.10.2025.pdf
Link:
View on Baza Konkurencyjności
Link:
Informacja o numerze rachunku bankowego w celu wniesienia WADIUM.pdf
Link:
Zał. 4 - Oświadczenia.docx
Link:
Zapytanie ofertowe - PSGKR.271.5.34.MB.docx
Link:
Schemat głównej rozdzielnicy elektrycznej oczyszczalni.
Link:
Ogłoszenie pierwotne (original notice)
CPV Code(s):
45232420 - Sewage work
45252000 - Construction works for sewage treatment plants, purification plants and refuse incineration plants
71220000 - Architectural design services
71320000 - Engineering design services
71340000 - Integrated engineering services