Construction of the Central Control Room of the Water and Sewerage Plant (ZWiK)
Contract Value:
-
Notice Type:
Contract Notice
Published Date:
18 November 2026
Closing Date:
23 November 2026
Location(s):
PL81 Lubelskie (PL Poland/POLSKA)
Description:
The project involves the design and construction of a Central Control Room at the Water and Sewerage Plant in Chełm, including comprehensive design documentation, necessary permits, construction of a new building, modernization of existing facilities, and installation of various systems.
AMENDMENT TO NOTICE no. 2026-64878-297031 (version published on 2026-11-18). Bid submission deadline: 2026-11-19 11:00 -> 2026-11-23 11:00. The current content of the notice is below; the original notice — see link.
Modernization of the water supply system of the City of Chełm 1. The subject of the contract is the implementation in the “design and build” formula of the task entitled “Construction of the Central Control Room of the Water and Sewerage Plant (ZWiK)” at ul. Bieławin 5 in Chełm. The scope of the contract includes the preparation of complete multidisciplinary design documentation, obtaining the required decisions, agreements, permits and notifications, and then the construction of a single-storey building of the central control room connected to the existing social and office building. The task also includes construction works in the existing building, including its thermal modernization, demolition works, execution of sanitary, electrical, telecommunication installations and security systems, equipment covered by the Functional and Utility Program (PFU), and land development. The contract also includes conducting tests, inspections and start-ups, obtaining documents required for the use of the facility, exercising author supervision, and handing over complete as-built documentation. The detailed scope of the contract is defined by the Functional and Utility Program along with Erratum no. 1 (referred to as PFU) and other contract documents. 2. Address of the main investment object: ul. Bieławin 5 22-100 Chełm Province: Lublin Country: Poland Precinct: 0007 Plots no. 214/15, 214/9 3. Warranty period requirements: the quality warranty period lasts for 60 months and starts on the date of completion of the Contract Subject. 4. A detailed description of the contract subject is in the PFU along with Erratum no. 1 marked as Attachment no. 9 to the Procurement Notice and the Contractor requirements description constituting the Contract Draft contained in Attachment no. 10 to the Procurement Notice. 5. The Contracting Authority does not allow variant bids. Category: Construction works / Construction works CPV: 45000000-7 Construction work, 45112710-5 Landscaping works, 45200000-9 Construction works for complete buildings or parts thereof and civil engineering works, 45262700-8 Building reconstruction, 45300000-0 Building installation works, 45400000-1 Finishing works in buildings, 71220000-6 Architectural design services, 71240000-2 Architectural, engineering and planning services, 71247000-1 Construction supervision, 71248000-8 Project and documentation supervision Place of execution: Chełm, Lubelskie Province Warranty period: 60 months Bid evaluation criteria: - The most advantageous offer shall be considered as the one not subject to rejection, submitted by a Contractor not subject to exclusion and meeting the participation conditions in the procedure, which obtains the highest score under the price criterion.
Participation conditions: - Knowledge and experience: For the technical or professional capacity condition, the Contracting Authority considers it fulfilled if: a) in the last 3 years before the bid submission deadline, or if the business activity period is shorter – in that period, properly performed at least 1 (one) service involving the preparation of a multidisciplinary construction design for the construction and/or reconstruction and/or extension of a building where social and sanitary facilities intended to serve at least 40 people per shift were designed, including at least changing rooms, toilets, showers, and a room intended for meal consumption, based on which a final building permit decision or equivalent consent of the competent authority in the country of investment implementation was issued; b) in the last 5 years before the bid submission deadline, or if the business activity period is shorter – in that period, properly performed at least 1 (one) construction work consisting of erecting a new building with masonry, reinforced concrete or mixed masonry-reinforced concrete structure, with a gross volume of not less than 1,500 m³. Additional explanations: 1) A building with masonry, reinforced concrete or mixed masonry-reinforced concrete structure is understood as a building whose main load-bearing system is made with one of the mentioned technologies. 2) Erection of a new building means constructing a building at a specified location where there was no building before the start of works, excluding superstructure, reconstruction or renovation of an existing building. For extension, the volume condition applies to the newly built part. 3) For assessing the condition by the gross volume of the building, the volume should be understood according to § 3 point 24 of the Regulation of the Minister of Infrastructure dated April 12, 2002, on technical conditions to be met by buildings and their location. 4) It is allowed that one of the persons designated as Construction Manager also performs the function of Site Manager if their building qualifications correspond to the type and scope of works covered by the building permit decision and design documentation. 5) Professional experience “in the preparation of construction designs” means actual participation as a designer in their specialty. 6) The experience condition must be met by the person assigned to the given function during contract execution. Designers’ experience only as project reviewers is not considered. 7) Periods expressed in years for demonstrating participation conditions are counted backward from the bid submission deadline. 8) Persons assigned by the Contractor to perform the contract who will assume independent technical functions in construction must have the required building qualifications for the assigned functions to design or supervise construction works according to the Building Law of July 7, 1994, and relevant regulations. The Contracting Authority also accepts qualifications obtained under earlier regulations if equivalent. 9) For Contractors indicating persons with professional qualifications from EU Member States, the EEA or Switzerland, the Contracting Authority allows their participation provided the qualifications are recognized according to Art. 12a of the Building Law and the Act on recognition of professional qualifications acquired in EU Member States implementing Directive 2005/36/EC. 10) Persons performing independent technical functions in construction must belong to the relevant professional self-government chamber according to the Act of December 15, 2000, on professional self-governments of architects and construction engineers. 11) The Contractor shall ensure that persons assigned to the contract have required qualifications and licenses throughout the contract execution period. - Persons capable of performing the contract: The Contracting Authority requires that Contractors submitting offers demonstrate that they have or will have during contract execution at least the following persons: a) one person acting as team leader - architect, holding unlimited architectural design licenses, with at least 3 years of professional experience in preparing construction designs (counted after registration in the relevant architects’ professional chamber list or equivalent qualifications obtained in other countries or previous regulations), who as an architectural designer participated in the preparation of a construction design for a building where social and sanitary facilities intended to serve at least 20 persons per shift were designed, including at least changing rooms, toilets, showers, and a room for meal consumption, based on which a final building permit or equivalent approval was issued in the investment country; b) one person acting as structural engineering designer holding unlimited design licenses in structural engineering specialty and documenting at least 3 years’ professional experience in preparing construction designs (counted after registration in the relevant civil engineers’ chamber list or equivalent); c) one person acting as electrical installation designer with unlimited design licenses for electrical and power installations and documenting at least 3 years’ professional experience in preparing construction designs; d) one person acting as sanitary installation designer with unlimited design licenses for heating, ventilation, gas, water supply and sewage installations and documenting at least 3 years’ professional experience in preparing construction designs; e) one person acting as road engineering designer holding at least limited design licenses in road specialty and documenting at least 3 years’ professional experience in preparing construction designs; f) one person acting as telecommunications installation designer with at least limited design licenses for telecommunication networks, installations and devices, and documenting at least 3 years’ professional experience in preparing construction designs; The combination of the above functions for designers and team leader is allowed provided the person meets all conditions required for each function. g) one person acting as Construction Manager for structural-construction works: - holding unlimited building licenses in structural construction specialty to supervise construction works, - having at least 5 years’ experience (not assistant) as a site manager, construction manager, or supervision inspector in structural-construction works. h) one person acting as Sanitary Works Manager: - holding unlimited building licenses in installation specialty for heating, ventilation, gas, water supply and sewage to supervise construction works, - having at least 5 years’ experience (not assistant) as a site manager, construction manager, or supervision inspector in sanitary works. i) one person acting as Electrical Works Manager: - holding unlimited building licenses in installation specialty for electrical and power installations to supervise construction works, - having at least 5 years’ experience (not assistant) as a site manager, construction manager, or supervision inspector in electrical works. The combination of the above functions for Works Managers is allowed if the person meets all required conditions for each function.
The Buyer:
Miejskie Przedsiębiorstwo Gospodarki Komunalnej Sp. z o.o.