SWN Stadtwerke Neumünster GmbH intends to procure a usable battery storage system with a capacity of 16 MW and a storage capacity of approximately 45 MWh, including turnkey delivery, construction, and commissioning. The building permit is already available. The scope of work also includes the production of the base slab as well as the construction of a noise protection wall and the 20 kV transfer station to the grid operator. The civil engineering work will be provided by SWN Stadtwerke Neumünster GmbH. The project also includes the necessary maintenance services for the battery storage system to ensure a permanently safe, reliable, and economical operation of the plant.
The goal of the project is to generate profits through battery marketing while simultaneously or flexibly using multiple electricity markets (balancing energy market, spot market). Modern grid-forming inverters are planned, which will also be capable of serving future markets, such as the instantaneous reserve market or the capacity market, and behaving in a grid-supportive manner.
The battery storage system is to be installed on the premises of SWN Stadtwerke Neumünster GmbH, Bismarckstraße 51, 24534 Neumünster.
SWN Stadtwerke Neumünster GmbH reserves the right to adjust the power and capacity parameters of the overall system during the further course of the project if necessary.
LOT-0001
LOT-0001 E74335345
Turnkey delivery, assembly, and commissioning of a battery storage system (BESS) on the premises of SWN Stadtwerke Neumünster GmbH.
SWN Stadtwerke Neumünster GmbH intends to procure a usable battery storage system with a capacity of 16 MW and a storage capacity of approximately 45 MWh, including turnkey delivery, construction, and commissioning. The building permit is already available. The scope of work also includes the production of the base slab as well as the construction of a noise protection wall and the 20 kV transfer station to the grid operator. The civil engineering work will be provided by SWN Stadtwerke Neumünster GmbH. The project also includes the necessary maintenance services for the battery storage system to ensure a permanently safe, reliable, and economical operation of the plant.
The goal of the project is to generate profits through battery marketing while simultaneously or flexibly using multiple electricity markets (balancing energy market, spot market). Modern grid-forming inverters are planned, which will also be capable of serving future markets, such as the instantaneous reserve market or the capacity market, and behaving in a grid-supportive manner.
The battery storage system is to be installed on the premises of SWN Stadtwerke Neumünster GmbH, Bismarckstraße 51, 24534 Neumünster.
SWN Stadtwerke Neumünster GmbH reserves the right to adjust the power and capacity parameters of the overall system during the further course of the project if necessary.