Implementation of BESS Systems in 2 Urban Buildings
Contract Value:
-
Notice Type:
Contract Notice
Published Date:
29 October 2026
Closing Date:
18 December 2026
Location(s):
BE BELGIQUE-BELGIË (BE Belgium/BELGIQUE-BELGIË)
BE100 Arr. de Bruxelles-Capitale/Arr. van Brussel-Hoofdstad (BE Belgium/BELGIQUE-BELGIË)
Assessment:
This notice contains 1 positive AI Assessment(s) of your products/services' relevance for this procurements.
Sign in to Tenderlake with your Pro or Primary account to read the assessments.
Description:
The project involves designing, delivering, and installing battery energy storage systems for urban buildings, including necessary electrical modifications, energy management, and compliance with regulatory standards.
The contract includes the design, delivery, installation, connection, and full commissioning of battery energy storage systems (BESS) for buildings of the City of Halle. The installations include, among other things, the necessary modifications to the electrical panels and cabling, protections, an energy management system, monitoring, and possible grid disconnection. The contractor is also responsible for the required grid studies and coordination with the distribution system operator, inspections, testing, training, technical documentation, and maintenance. The systems must be delivered as one safe, reliable, and ready-to-use unit and comply with the AREI, applicable Belgian and European standards, and the grid operator’s regulations.