The subject of the contract is the modernization of the water intake, treatment, and supply system as part of the implementation of the project entitled: "Modernization and commissioning of an intelligent water supply network in the Municipality of Andrzejewo".
LOT-0001
part 1 of the contract
Water distribution control.
1. The scope of the contract includes in particular the following elements:
1) Devices for operation and control of water distribution along with water network monitoring, including:
a) DN 20 meters with covers and backflow prevention valve – 945 pcs.,
b) Mobile hydrant meters – 1 pc.,
c) Radio Scanner – 1 pc.,
d) Tablet for reading and configuring measuring devices – 1 pc.,
e) Measuring posts – 15 pcs.,
f) Replacement of hydrants with DN80 valves – 350 pcs.
g) Replacement of DN100 valves – 6 pcs.,
h) Replacement of DN100 valves – 12 pcs.,
i) Replacement of DN150 valves – 12 pcs.,
j) Replacement of DN150 valves – 5 pcs.,
k) Replacement of DN200 valves – 2 pcs.,
l) Cleaning, flushing, and disinfection of the network – 1 set,
m) Pipe freezer – 1 pc.,
n) Rack cabinet 27U with accessories (strip, patch panel, shelf) – 1 pc.,
o) Server – 1 pc.,
p) NAS server for backup – 1 pc.,
q) UPS power supply – 1 pc.,
r) Managed switch – 1 pc.,
s) UTM – 1 pc.,
t) Computer set with monitor and software – 1 pc.,
u) Laptop with software – 1 pc.
2) Software for operation and control of water distribution and water network monitoring, including:
a) eBOK – 1 pc.,
b) eGIS – 1 pc.,
c) Telemetry system for water sales management – 1 pc.,
d) Mathematical model of the water distribution system – 1 pc.,
e) System for smart water network management (e.g., SCADA) – 1 pc.,
f) ERP system integration – 1 pc.,
g) Backup software – 1 pc.,
h) Cybersecurity system (Log server, SIEM, vulnerability management) – 1 set,
3) Implementation of software and hardware – 1 set,
4) Modernization of the Water Treatment Plant (SUW) in Andrzejewo, including:
a) Replacement of two deep well pumps – 1 set,
b) Installation of UV lamps – 1 set,
5) Modernization of the Water Treatment Plant (SUW) in Zaręby Bolędy, including:
a) Replacement of two deep well pumps – 1 set,
b) Installation of UV lamps – 1 set,
6) Modernization of the Water Treatment Plant (SUW) in Króle Małe, including:
a) Installation of UV lamps – 1 set.
2. A detailed description of the contract subject, including size, scope, type and quantity of supplies and services, warranty conditions, and service, is specified in Attachment No. 1 to the Terms of Reference (SWZ).
LOT-0002
part 2 of the contract
Execution of photovoltaic installations at Water Treatment Plants (SUW).
1. The scope of the contract includes in particular:
1) supply, installation, and commissioning based on the technical documentation held by the Contracting Authority of 3 photovoltaic installations on public utility buildings, including:
a) photovoltaic installation with a minimum power of 30 kW with a 45 kWh energy storage for the hydro-pneumatic building in Andrzejewo on plot no. 459/3 Andrzejewo precinct,
b) photovoltaic installation with a minimum power of 40 kW with a 60 kWh energy storage for the hydro-pneumatic building in Króle Małe on plot no. 49 Króle Małe precinct,
c) photovoltaic installation with a minimum power of 30 kW with a 45 kWh energy storage for the hydro-pneumatic building in Zaręby Bolędy on plot no. 113 Zaręby Ciemne precinct.
2) supply of all components of the photovoltaic installation,
3) extension of the power line to the inverter,
4) installation of photovoltaic modules,
5) layout of cables connecting photovoltaic modules,
6) layout of cables connecting photovoltaic modules with the inverter,
7) installation of the inverter and DC and AC side protections,
8) connection of modules to the inverter,
9) connection of the installation to the electricity meter,
10) checking the operation of the system,
11) conducting installation measurements,
12) site cleaning and handing over the finished system to the investor for operation,
13) training of designated persons in operating and procedures in case of malfunctions,
14) preparation of measurement protocols,
15) acceptance of works with handover of as-built documentation, measurement protocols, and product certificates.
2. A detailed description of the contract subject is contained in Attachments No. 1a – 1c to the Terms of Reference (SWZ), which include the technical designs.