Comprehensive Modernization of the "Lis" Water Treatment Station and Modernization of the Water Supply Network in Kalisz Along with a Hydrodynamic Model of Its Operation | Tenderlake

Comprehensive Modernization of the "Lis" Water Treatment Station and Modernization of the Water Supply Network in Kalisz Along with a Hydrodynamic Model of Its Operation

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
13 November 2026
Closing Date:
23 November 2026
Location(s):
PL41 Wielkopolskie (PL Poland/POLSKA)
Description:
The project involves comprehensive upgrades to the Lis Water Treatment Station in Kalisz to enhance water supply safety, reliability, and energy efficiency through various construction and technological improvements.
CHANGE OF NOTICE no. 2026-132139-296972 (version published on 2026-11-13). Deadline for submission of offers: 2026-11-19 09:00 -> 2026-11-23 09:00. Current content of the notice below; original notice — see link.

Modernization of the LIS water treatment station in Kalisz
The subject of the contract includes a comprehensive modernization of the Lis Water Treatment Station, aimed at increasing the safety of water supply intended for human consumption, improving the reliability of technological processes, reducing the risk of failure, and enhancing the energy efficiency of the facility.
The scope of the contract includes mutually connected construction, technological, sanitary, electrical works, as well as automation and control, in particular:
• replacement of filtration drainage along with adaptation of the filter system,
• modernization of filtration chambers and clean water tanks,
• replacement of technological fittings along with electric drives
• and integration with the control system,
• modernization of the disinfection process by installing UV systems,
• modernization of the water pumping station with the application of frequency converters,
• modernization of low voltage power supply systems and AKPiA systems including adaptation of control software,
• performing servicing activities for all devices and installations during the warranty and liability period
including spare parts, consumables, and all necessary elements required for trouble-free operation of all devices and installations, in accordance
with the manufacturers' requirements and instructions for use, operation, warranty cards, and documentation of installed devices, fittings, automation, and other materials.
Category: Construction work / Construction work
CPV: 31682210-5 Control instruments and apparatus, 45000000-7 Construction work, 45231300-8 Construction work for water and sewage pipelines, 45232430-5 Water treatment works, 45252126-7 Construction work for drinking water treatment plants, 45310000-3 Electrical installation work, 45311200-2 Electrical installation works, 45330000-9 Water supply and sanitation installation works, 45450000-6 Other finishing construction works
Place of execution: Kalisz, Greater Poland Voivodeship
Warranty period: 60 months
Evaluation criteria for offers:
- The criterion to be assessed here will be the total gross price. The evaluation formula for the “price” criterion will be:

points = (price of the lowest priced non-rejected offer / price of the evaluated offer) * 100 * weight

The maximum points for this criterion is 100.

Participation conditions:
- Economic and financial status: Contractors may apply who are in an appropriate economic or financial situation, i.e., they hold liability insurance for business activity with a guarantee sum of not less than PLN 20,000,000.00.
- Knowledge and experience: Contractors may apply who have relevant experience, i.e., within 7 years prior to the deadline for submission of offers, or if the period of operation is shorter – during that period, they have duly executed:
a) at least 1 (one) contract (agreement, contract, order) for construction works, meeting all the following conditions together:
• the value of the completed contract was at least PLN 12,000,000.00 net,
• the scope of construction works included modernization, redevelopment or expansion of a water treatment station using open filters;
b) at least 1 (one) contract for construction works meeting all the following conditions:
• the value of the completed contract was not less than PLN 10,000,000.00 net,
• the scope of works in the contract included modernization, redevelopment or expansion of a water treatment station or sewage treatment plant or hydrophore or pumping station.

NOTE: The construction work referred to in point b) above must be separate from that indicated in point a) above; in other words, the Contractor must demonstrate execution of a minimum of 2 (two) construction works in total.
- Persons capable of executing the contract: Contractors may apply who have or will have appropriate personnel for execution of the contract:

a) one person acting as construction manager, holding construction qualifications for managing construction works in the installation specialty covering networks, installations and heating, ventilation, gas, water supply and sewage devices without restrictions or equivalent, issued under previous construction regulations, having experience as construction manager acquired during at least one contract meeting all the following conditions:
• the role of construction manager was held for at least one year and included completion and acceptance of the investment,
• the value of the contract was at least PLN 5,000,000.00 net,
• the contract covered construction works within modernization, redevelopment or expansion of water treatment stations or sewage treatment plants or hydrophores or pumping stations;

b) at least one person acting as works manager, holding qualifications to manage construction works in the structural and construction specialty without restrictions and having experience as works manager or construction manager, acquired during at least one contract meeting all the following conditions:
• the role of works manager or construction manager was held for at least one year,
• the contract covered construction works within modernization, redevelopment or expansion of water treatment stations or sewage treatment plants or hydrophores or pumping stations;

c) at least one person acting as works manager, holding qualifications to manage construction works in the installation specialty for electrical and power engineering networks and devices, having experience as works manager or construction manager, acquired during at least one contract meeting all the following conditions:
• the role of works manager or construction manager was held for at least one year,
• the contract covered construction works within modernization, redevelopment or expansion of water treatment stations or sewage treatment plants or hydrophores or pumping stations.
The Buyer:
Przedsiębiorstwo Wodociągów i Kanalizacji z siedzibą w Kaliszu
Magdalena Włodarek
Nowy Świat 2a
Kalisz
62-800
PL
Email:
m.wlodarek@wodociagi-kalisz.pl
Additional information:
Link:
Wzór umowy
Link:
Informacja o zmianach 4.11.2026 r.
Link:
Szczegółowy OPZ - dokumentacja projektowa cz. 2
Link:
View on Baza Konkurencyjności
Link:
Szczegółowy OPZ - STWiORB
Link:
Załączniki 1 - 15
Link:
Zmiana wzoru umowy - 13.11.2026 r.
Link:
Zmiana wzoru umowy
Link:
Szczegółowy OPZ - dokumentacja projektowa cz. 1
Link:
Ogłoszenie pierwotne (original notice)
Link:
Informacja o zmianie ogłoszenia
Link:
ZAPYTANIE OFERTOWE
CPV Code(s):
31682210 - Instrumentation and control equipment
45000000 - Construction work
45231300 - Construction work for water and sewage pipelines
45232430 - Water-treatment work
45252126 - Drinking-water treatment plant construction work
45310000 - Electrical installation work
45311200 - Electrical fitting work
45330000 - Plumbing and sanitary works
45450000 - Other building completion work