1. The subject of the contract is the delivery and implementation of an intelligent management and monitoring system for water supply infrastructure as part of the investment task titled “Intelligent Management and Monitoring of Water Supply Infrastructure in the Gmina Gidle Area.” 2. The scope of the supply includes: 1) a monitoring and analysis system for the water supply network consisting of the delivery and replacement of water meters with intelligent ones, along with software for readings and management in residential buildings, business facilities, public utility buildings, and water stations, into intelligent measuring devices with communication modules, enabling comprehensive analysis of the state of the water supply network. Number of devices: a) single-stream dry-type water meters equipped with a radio module for remote reading, DN 20 – 2173 pieces, including: - water meter wells not requiring a passive antenna – 2123 pcs. - water meter wells requiring a passive antenna – 50 pcs. b) ultrasonic water meter, equipped with a radio module for remote reading DN25 – 7 pieces, including; - not requiring passive antennas – 4 pcs. - requiring passive antennas – 3 pcs. c) ultrasonic water meter, equipped with a radio module for remote reading DN32 – 9 pieces; d) ultrasonic water meter, equipped with a radio module for remote reading DN40 – 5 pieces; e) ultrasonic water meter, equipped with a radio module for remote reading DN100 – 1 piece, f) screw water meter for measuring wells at extraction points DN100 with GSM recorder, as part of the system for intelligent management of the water supply network - 1 piece g) software for reading and data management (mobile application and management platform) along with a reading set (smartphone, scanner, antennas, head); 2) system for intelligent management of the water supply network, including the installation of a telemetry set – 10 pcs. and a monitoring system. The system involves measuring key sections of the network and significant points, such as water intakes, which will contribute to the optimization of water transmission and quick detection of areas of excessive consumption as well as potential failure locations, network efficiency, and faster problem resolution, ensuring its appropriate pressure and quality. 3) a Geographic Information System (GIS) enabling central management of data regarding the water supply network, which will allow for effective management of water resources, searching, identifying, categorizing, advanced symbolizing, creating statistics, generating prints, maintaining records, tracking and notifying about changes, planning maintenance, conducting measurements with attachments, notes, and reports, as well as conducting analyses and comparisons, rapid visualization, and localization of objects and events on the network, which will significantly increase the availability and knowledge about the water supply infrastructure. The GIS system as an organized environment will include server software, with multi-station access (desktop) via a web browser (www) with a central database for entering, collecting, processing, and visualizing spatial and descriptive data enabling central management of data regarding the water supply network, such as the location of pipes, technical parameters, repair histories or water quality data; 4) mathematical model of the water distribution system – network skeleton – showing the locations of objects, meter data, used to identify water consumers to charge the skeleton of the network with resulting off-takes; technical data on key hydraulic objects located in the network, such as pumps, tanks, valves, intakes, reducers; hydraulic settings of objects, control rules, pump curves, device operating schedules. 5) installation of drinking fountains – 3 pcs. 3. A detailed description of the subject of the contract and the scope of work to be performed by the contractor is provided in Attachment No. 1 to the SWZ. 4. The devices should be brand new, have a guarantee, and a catalog card confirming the technical parameters of the water meters. 5. The scope of the subject matter of the contract also includes carrying out all dismantling work. The contractor is obliged to dispose of the dismantled materials as part of the contractual remuneration in accordance with legal regulations, including securing, cleaning work, and systematic removal of waste to a licensed landfill with documentation of this removal. The waste management process will be carried out independently by the entity performing the work or entrusted to specialized entities that will include the actual costs associated with waste management and disposal in the service price. 6. Other obligations of the contractor 1) Equipment and delivery vehicles used to perform the contract must be powered/charged from renewable energy sources. The contracting authority allows vehicles such as: BEV (Battery Electric Vehicle), PHEV (Plug-in Hybrid Electric Vehicle), FCEV (Fuel Cell Electric Vehicle), EREV (Extended Range Electric Vehicle). Equipment and vehicles used to implement the project must have the necessary technical examinations. Each instance of using tools, including delivery vehicles, inconsistent with the above provision will result in a contractual penalty in accordance with the contract. 2) The contractor is obliged to deliver and install the subject of the contract fully adapted for persons with disabilities and special needs – according to applicable regulations, including the Act of July 19, 2019, on ensuring accessibility for persons with special needs, particularly Article 6. 7. The contract is being implemented as part of the project “Intelligent Management and Monitoring of Water Supply Infrastructure in the Gmina Gidle Area,” which is co-funded by the European Regional Development Fund under the regional program European Funds for Łódzkie 2021-2027. Contract number FELD.02.12-IZ.00-0008/24-00.
LOT-0001
IZP.271.3.2026
Intelligent Management and Monitoring of Water Supply Infrastructure in the Gmina Gidle Area.
4.1. The subject of the contract is the delivery and implementation of an intelligent management and monitoring system for water supply infrastructure as part of the investment task titled “Intelligent Management and Monitoring of Water Supply Infrastructure in the Gmina Gidle Area.” 4.2. The scope of the supply includes: 1) a monitoring and analysis system for the water supply network consisting of the delivery and replacement of water meters with intelligent ones, along with software for readings and management in residential buildings, business facilities, public utility buildings, and water stations, into intelligent measuring devices with communication modules, enabling comprehensive analysis of the state of the water supply network. Number of devices: a) single-stream dry-type water meters equipped with a radio module for remote reading, DN 20 – 2173 pieces, including: - water meter wells not requiring a passive antenna – 2123 pcs. - water meter wells requiring a passive antenna – 50 pcs. b) ultrasonic water meter, equipped with a radio module for remote reading DN25 – 7 pieces, including; - not requiring passive antennas – 4 pcs. - requiring passive antennas – 3 pcs. c) ultrasonic water meter, equipped with a radio module for remote reading DN32 – 9 pieces; d) ultrasonic water meter, equipped with a radio module for remote reading DN40 – 5 pieces; e) ultrasonic water meter, equipped with a radio module for remote reading DN100 – 1 piece, f) screw water meter for measuring wells at extraction points DN100 with GSM recorder, as part of the system for intelligent management of the water supply network - 1 piece g) software for reading and data management (mobile application and management platform) along with a reading set (smartphone, scanner, antennas, head); 2) system for intelligent management of the water supply network, including the installation of a telemetry set – 10 pcs. and a monitoring system. The system involves measuring key sections of the network and significant points, such as water intakes, which will contribute to the optimization of water transmission and quick detection of areas of excessive consumption as well as potential failure locations, network efficiency, and faster problem resolution, ensuring its appropriate pressure and quality. 3) a Geographic Information System (GIS) enabling central management of data regarding the water supply network, which will allow for effective management of water resources, searching, identifying, categorizing, advanced symbolizing, creating statistics, generating prints, maintaining records, tracking and notifying about changes, planning maintenance, conducting measurements with attachments, notes, and reports, as well as conducting analyses and comparisons, rapid visualization, and localization of objects and events on the network, which will significantly increase the availability and knowledge about the water supply infrastructure. The GIS system as an organized environment will include server software, with multi-station access (desktop) via a web browser (www) with a central database for entering, collecting, processing, and visualizing spatial and descriptive data enabling central management of data regarding the water supply network, such as the location of pipes, technical parameters, repair histories or water quality data; 4) mathematical model of the water distribution system – network skeleton – showing the locations of objects, meter data, used to identify water consumers to charge the skeleton of the network with resulting off-takes; technical data on key hydraulic objects located in the network, such as pumps, tanks, valves, intakes, reducers; hydraulic settings of objects, control rules, pump curves, device operating schedules. 5) installation of drinking fountains – 3 pcs. 4.3. A detailed description of the subject of the contract and the scope of work to be performed by the contractor is provided in Attachment No. 1 to the SWZ. 4.4. The devices should be brand new, have a guarantee, and a catalog card confirming the technical parameters of the water meters. 4.5. The scope of the subject matter of the contract also includes carrying out all dismantling work. The contractor is obliged to dispose of the dismantled materials as part of the contractual remuneration in accordance with legal regulations, including securing, cleaning work, and systematic removal of waste to a licensed landfill with documentation of this removal. The waste management process will be carried out independently by the entity performing the work or entrusted to specialized entities that will include the actual costs associated with waste management and disposal in the service price. 4.6. Other obligations of the contractor 1) Equipment and delivery vehicles used to perform the contract must be powered/charged from renewable energy sources. The contracting authority allows vehicles such as: BEV (Battery Electric Vehicle), PHEV (Plug-in Hybrid Electric Vehicle), FCEV (Fuel Cell Electric Vehicle), EREV (Extended Range Electric Vehicle). Equipment and vehicles used to implement the project must have the necessary technical examinations. Each instance of using tools, including delivery vehicles, inconsistent with the above provision will result in a contractual penalty in accordance with the contract. 2) The contractor is obliged to deliver and install the subject of the contract fully adapted for persons with disabilities and special needs – according to applicable regulations, including the Act of July 19, 2019, on ensuring accessibility for persons with special needs, particularly Article 6. The contractor must comply with the provisions of this Act, particularly meeting the minimum requirements to ensure accessibility for persons with special needs.